Workover (Rig-Based)
Conventional workover uses a workover rig to pull and run tubing on a killed (depressurized) well. Used for tubing changes, completion work, and major well repairs. The most common type of well intervention.
Well intervention covers all operations performed on a well after completion —from routine well servicing and workover to complex live well intervention. We supply a complete range of well intervention equipment: workover rigs, coiled tubing units, snubbing units, wireline equipment, and pressure control products. Whether you need routine well servicing or complex live well work, we have the right equipment for the job.
Well intervention covers a wide range of operations, each requiring different equipment:
Conventional workover uses a workover rig to pull and run tubing on a killed (depressurized) well. Used for tubing changes, completion work, and major well repairs. The most common type of well intervention.
Coiled tubing units perform through-tubing interventions without killing the well or pulling the completion. Used for well cleanout, stimulation, logging, and plug setting. Rigless intervention —faster and cheaper than workover for many operations.
Snubbing units (hydraulic workover) perform intervention on live, pressurized wells. Can run and pull jointed pipe under pressure. Used for live well work where killing the well is undesirable or impossible.
Wireline units run electric line or slickline for logging, plug setting, gauge running, and downhole tool deployment. The lightest and most economical intervention method for simple downhole operations.
We supply a complete range of equipment for all types of well intervention:
Truck-mounted workover rigs for conventional well workover and completion operations.
CT units for rigless through-tubing intervention, cleanout, and stimulation operations.
Hydraulic workover units for live well intervention on pressurized wells.
BOPs, risers, strippers, and well control products for safe intervention operations.
Well intervention equipment is used for a wide range of operations:
Running and pulling production tubing. The most common workover operation. Performed on killed wells using workover rigs.
Removing scale, sand, paraffin, and other debris from the wellbore. Commonly performed with coiled tubing units using jetting tools or mills.
Matrix acidizing, acid fracturing, and proppant fracturing. Performed with coiled tubing units for through-tubing stimulation or directly through the tubing.
Setting and retrieving downhole plugs for zonal isolation, well abandonment, or well control. Performed with wireline or coiled tubing units.
Running production logs, temperature surveys, pressure surveys, and other downhole measurements. Performed with wireline units or coiled tubing units.
Running completion strings, setting packers, perforating, and well completion operations. Performed with workover rigs or coiled tubing units depending on the operation.
Different intervention methods have different cost, speed, and capability tradeoffs:
| Method | Typical Cost | Mobilization Time | Capabilities |
|---|---|---|---|
| Wireline | Lowest | Fast (1–3 days) | Logging, plug setting, light intervention |
| Coiled Tubing | Medium | Medium (2–4 days) | Cleanout, stimulation, milling, through-tubing work |
| Snubbing (Live Well) | High | Medium (3–5 days) | Live well jointed pipe intervention |
| Workover Rig | Highest | Slow (5–10 days) | Tubing pulling/running, completion, major workover |
"Workover" usually refers to rig-based operations on a killed (depressurized) well —pulling tubing, running completion, major repairs. "Well intervention" is a broader term that includes all well work operations, including rig-based workover, rigless coiled tubing intervention, snubbing (live well), and wireline operations. In practice, "well intervention" is often used for rigless or live well operations, while "workover" refers to conventional rig-based work. But the terms overlap.
Use coiled tubing when: you need through-tubing intervention without pulling the completion (cleanout, stimulation, logging, plug setting), you want to avoid killing the well, or you need a faster, cheaper intervention. Use a workover rig when: you need to pull or run tubing, replace completion components, or perform major well repairs that require the completion to be pulled. For many operations, coiled tubing is the faster and cheaper option. Tell us what you need to do, and we will recommend the right method and equipment.
Snubbing (hydraulic workover) is live well intervention using a specialized unit that can run and pull jointed pipe on a pressurized well —without killing the well. It's needed when: (1) killing the well would damage the reservoir, (2) the well cannot be killed (pressure too high), (3) you need to minimize downtime and return the well to production quickly, or (4) you're working on a well that cannot be shut in. Snubbing is more expensive than conventional workover, but it's the right tool for live well work.
Yes. We can supply a complete well intervention equipment package: workover rig, coiled tubing unit, snubbing unit, pressure control equipment (BOPs, risers, strippers), and support equipment. We work with you to design the right equipment package for your specific intervention operations. We also provide training, spare parts, and field service support. Contact us to discuss your requirements.
The pressure control equipment (BOPs, risers, strippers) must be rated for at least the maximum well pressure you will encounter during intervention. For most onshore wells, 70 MPa (10,000 psi) is standard. For higher-pressure wells, you may need 105 MPa (15,000 psi). Tell us your well pressure, and we will recommend the right pressure rating for your intervention equipment.
Tell us about your intervention type (workover, coiled tubing, snubbing, wireline), well conditions (pressure, depth, fluid type), and operations. Our engineers will help you choose the right intervention method and equipment package.