Global Delivery | On-Site Support

Oilfield Equipment Shipping & Installation

Getting heavy oilfield equipment from our factory in China to your location, and getting it installed and running, is a complex logistics process. We handle the entire chain: international freight, export documentation, customs clearance support, and on-site installation supervision. Our goal is to make the delivery and commissioning process as smooth and stress-free as possible for you.

Shipping Options

We offer multiple shipping options to match your needs:

FOB (Free on Board)

We deliver the equipment to the Chinese port and load it onto your nominated vessel. You arrange and pay for ocean freight, insurance, and destination port charges. Best if you have your own freight forwarder. We handle all export documentation.

CIF (Cost, Insurance, Freight)

We arrange and pay for ocean freight and insurance to your destination port. You handle customs clearance and inland transport. Best if you want us to handle the international shipping leg. We use reliable freight forwarders.

DDP (Delivered Duty Paid)

We handle everything: ocean freight, insurance, export/import customs clearance, duties, taxes, and inland delivery to your facility. Door-to-door service. Best if you want a completely hands-off shipping experience.

Air Freight (for Spare Parts)

For urgent spare parts or small equipment items, we can ship by air freight. Faster (3–5 days worldwide) but more expensive. We use reliable air freight forwarders for urgent shipments.

Export Documentation We Provide

We handle all required export documentation for international shipping:

Commercial Documents

Commercial invoice, packing list, bill of lading (B/L), export declaration. These are standard shipping documents required by customs. We prepare everything accurately and in the correct format.

Certificate of Origin

Certificate of Origin (CO) showing the equipment was manufactured in China. Required by customs in many countries. We can arrange both general CO and specific CO formats as required.

Equipment Documentation

Operation manual, maintenance manual, parts list, electrical schematics, P&ID diagrams, test reports, material certificates. Complete technical documentation package for your equipment.

Certification Documents

API certificate, ISO certificate, and other equipment certification documents as applicable. These may be required by your local authorities or for regulatory compliance.

Installation & Commissioning Support

We provide on-site support for installation and commissioning:

Installation Supervision

Our service engineers travel to your location to supervise your crew during equipment installation. We verify that installation is done correctly per our guidelines. On-site supervision ensures the equipment is installed properly from day one.

Commissioning & Start-Up

After installation, our engineers commission the equipment: perform functional tests, verify all systems work correctly, and run the equipment at operating conditions. We ensure the equipment is ready for production before handover.

Operator Training

Hands-on training for your operators and maintenance technicians. Training covers equipment operation, routine maintenance, safety procedures, and emergency response. Well-trained operators = efficient, safe operations.

Turnkey Installation

For complete turnkey service, our team can handle the entire installation: rigging, positioning, connection, and commissioning. You just provide the site and utilities. We handle everything else.

Typical Shipping & Installation Timeline

Here's what to expect after your equipment is manufactured:

Stage Duration What Happens
Factory Acceptance Test (FAT) 1–2 weeks Equipment is tested at our factory. You may witness FAT in person or via video.
Preparation for Shipment 1–2 weeks Equipment is prepared for export: cleaned, preserved, crated, and documented.
Export to Port 3–7 days Equipment is transported from our factory to the Chinese export port.
Ocean Freight 2–6 weeks Depends on destination: Asia 1–2 weeks, Middle East 2–4 weeks, Europe 4–6 weeks, Americas 4–6 weeks.
Customs Clearance 1–2 weeks Equipment clears customs at destination port. We provide all required documentation.
Inland Delivery 3–14 days Equipment is transported from port to your facility.
Installation & Commissioning 1–4 weeks Depends on equipment size and complexity. Small units 1 week, large spreads 3–5 weeks.

Frequently Asked Questions

What shipping terms do you recommend?

It depends on your situation. If you have experience with international freight and your own forwarder, FOB is usually most cost-effective. If you want us to handle the shipping but you handle customs clearance, CIF is a good choice. If you want a completely hands-off experience, DDP means we handle everything including duties and taxes. Tell us your preference and we will provide a quote for each option so you can compare.

How long does ocean freight take to my country?

Typical ocean transit times from Chinese ports: (1) Southeast Asia: 5–10 days, (2) Middle East / Gulf: 15–25 days, (3) Europe / Mediterranean: 30–45 days, (4) East Coast USA: 35–45 days, (5) West Coast USA: 15–25 days, (6) South America: 35–50 days, (7) Africa: 25–10 days. These are approximate times —actual transit depends on shipping line and schedule.

Do you handle customs clearance in our country?

For DDP shipments, we handle both export and import customs clearance, including duties and taxes. For FOB and CIF shipments, you handle import customs clearance. We provide all the documentation you need: commercial invoice, packing list, certificate of origin, bill of lading, and any other documents required by your customs authority.

How much does installation supervision cost?

Installation supervision costs depend on: (1) number of service engineers needed, (2) duration of the visit, (3) destination location (airfare, lodging, per diem). We provide a detailed quote for installation service based on your specific requirements. Installation service is a worthwhile investment —it ensures your equipment is installed and commissioned correctly.

Can you send installation instructions instead of sending an engineer?

Yes, we can provide detailed installation manuals and video guidance if you prefer to handle installation yourself. This is suitable for experienced crews and simpler equipment types. For more complex equipment or first-time installations, we strongly recommend on-site supervision. Our installation manuals are comprehensive and include step-by-step instructions.

Need Shipping or Installation Support?

Tell us your destination country and equipment requirements. We will provide a detailed shipping quote and explain our installation and commissioning support options.