Workover Rig: Pulling and Running Tubing
A workover rig (also called a pulling unit or service rig) is designed to pull and run tubing in and out of the wellbore. It uses a drawworks and a mast to lift and lower jointed tubing (usually 27 or 30 feet per joint).
Best for:
- Pulling and running production tubing
- Pump changes and rod replacement
- Plug setting and retrieval
- General well servicing where you need to pull tubing
Strengths: High pull force (up to 1500 kN), can handle large tubing sizes, relatively low cost per day, familiar technology for most crews.
Limitations: Cannot run under pressure (needs to kill the well), slow because you have to make and break joints, cannot reach horizontal sections easily.