Introduction and application notes
In response to the limited operation caused by limited capacity of well site transformers, we have developed XJ350 electric workover rig, with power coming from 30KVA well site transformer plus battery storage energy in the case of rig operation, and from the chassis engine in the case of rig movement.
What this model is built to handle
When this model is shortlisted, the practical check is whether the xj350 battery energy storage workover rig supports the target duty without extra handling risk.
If the project already has a clear target for working capacity, power arrangement, site footprint, this page becomes easier to use because the remaining checks are mostly about layout, control, and installation limits.
A stronger purchase case usually appears when the model gives a clearer answer on 350, service access, and the local delivery plan.
What buyers usually compare
Layout and handling
The field-deployable format reduces setup friction when the site needs a compact footprint.
Capacity boundary
Buyers should start with working capacity, power arrangement, and site footprint because it defines the usable duty range.
Control package
The control package is arranged to match field-side decisions without unnecessary manual steps.
Maintenance access
Field service is simpler when the main components remain accessible after installation.
Where the package fits best
Typical duty
well servicing campaigns across land or desert blocks where a field-deployable format matters.
Field condition
The model is more suitable when field operation is part of the job requirement.
Project scenario
workover projects that need efficient rig-up and consistent pipe handling with field-side control and stable handling.
Main assembly and field interfaces
Principal unit
The main assembly carries the workover rig package function and defines the working layout of the unit.
Control system
The control package is tuned to keep the operator's tasks clear and the sequence consistent.
Mobilization format
Transport and setup remain important because the package has to fit the actual field logistics.
Field interfaces
Shared interfaces, hoses, cable points, or load paths should be checked together with the main specification.