Mobile Workover Rig: Road-Ready Well Servicing
A mobile workover rig is a truck-mounted unit that drives to the well site, rigs up in hours, and starts work. It is the standard for onshore well servicing —production maintenance, completion work, and tubing pulling. No crane needed, no heavy lift, just drive in and start working.
When to Choose a Mobile Workover Rig
Truck mounted workover rigs are the right choice when:
- You need to move between well sites frequently —the rig drives itself, no disassembly required
- Well sites are accessible by road —most onshore production fields have road access
- You need to start work quickly —rig up in 2-4 hours, not days
- The well has moderate tubing loads (30-150 tons hook load)
- You want a self-contained unit: power, hoisting system, and operator cab all on one chassis
If you have remote locations with no road access, or need very high lifting capacity, look at skid mounted or heavy-duty workover rigs instead. The mobile truck rig is the most versatile and widely used configuration.
Typical Specifications
| Parameter | Typical Range |
|---|---|
| Hook load capacity | 30 - 150 tons |
| Mast height | 22 - 36 m (single or double mast) |
| Line pull (drawworks) | 3 - 15 tons |
| Engine power | 200 - 400 HP |
| Truck chassis | 6x4 or 8x4 heavy duty |
| Rig up time | 2 - 4 hours |
Frequently Asked Questions
What is the difference between a workover rig and a drilling rig?
A workover rig is smaller and lighter than a drilling rig. It is designed for well servicing operations (pulling tubing, running completion, maintenance) rather than drilling new wells. Workover rigs have lower hook load capacity, shorter masts, and faster mobilization. They are cheaper to operate and more maneuverable. If you need to drill a new well, use a drilling rig. If you need to service an existing well, use a workover rig.
How fast can a mobile workover rig move between wells?
On public roads, a truck mounted workover rig moves at normal highway speeds (60-80 km/h). It doesn't need to be disassembled —the mast can be folded down and locked for transport. Rig up at the next well takes 2-4 hours. This means you can service 1-2 wells per day depending on distance. Compare this to a skid mounted rig that requires a crane and several days to move.
Can a mobile workover rig handle deviated wells?
Yes, within limits. Mobile workover rigs can handle wells with moderate deviation (up to 30-45 degrees). For highly deviated or horizontal wells, you may need coiled tubing units or specialized workover equipment. The rig's drawworks and hoisting system handle the vertical load; deviation affects drag on the tubing but doesn't prevent the workover rig from doing the job. Our engineering team can advise based on your well profile.
Need a Mobile Workover Rig?
Tell us your required hook load, mast height and preferred chassis. Our engineering team will recommend the right workover rig and provide a quote within 48 hours.