How fast can a mobile rig move between well sites?
On public roads, a mobile rig travels at typical highway speeds (60-80 km/h). On location (between wells on the same pad), speeds are much slower —5-15 km/h. The total time to move between well sites depends on distance, number of loads and road conditions. Typically, a complete rig-down, transport and rig-up takes 2-3 days for a medium-sized mobile rig.
What is the maximum depth a mobile rig can drill?
Mobile rigs are typically limited to medium-depth wells (=?4,500 m) due to transport weight and dimension limits. Deeper wells require larger capacity rigs that cannot be easily moved on public roads. For ultra-deep drilling, skid-mounted rigs are still the standard.
How much does a mobile drilling rig cost compared to a skid rig?
A mobile rig typically costs 15-30% more than an equivalent skid-mounted rig due to the chassis, mobility systems and engineering required. However, the time savings (6-11 days per move) often justify the premium cost. In cluster drilling with many wells, the payback period is typically 1-2 years.
Can you customize a mobile rig for my country's road regulations?
Yes. We can customize the rig to meet specific road weight and dimension limits. This may include splitting the rig into more loads, using different trailer configurations, or adjusting the rig design to comply with local regulations. Tell us your country's road limits and we will design a compliant rig.
What is the lead time for a mobile drilling rig?
Standard configuration mobile rigs take approximately 12-18 months from order confirmation. Custom configurations (special terrain package, automation system, unique road-compliance design) may require 18-24 months. Refurbished or near-stock mobile rigs can be delivered in 3-6 months.