What size drilling rig do I need?
The rig size depends on your target drilling depth. General guidance: (1) 1,500–2,500 m depth: ZJ-15 (150-ton) rig, (2) 2,500–3,500 m: ZJ-30 (300-ton) rig, (3) 4,000–5,000 m: ZJ-50 (500-ton) rig, (4) 5,000–7,000 m: ZJ-70 (700-ton) rig. The rig should be sized for your planned drilling depth plus some margin. Tell us your target depth and well design, and we will recommend the right rig size.
What's the difference between API 4F and API 7K?
API 4F covers the complete drilling rig as a whole system (derrick, substructure, overall rig structural design). API 7K covers the individual hoisting and circulating equipment components (drawworks, traveling blocks, hooks, swivels, rotary tables). In practice, a complete API 4F rig will use API 7K-certified hoisting components. The rig is designed to API 4F; the individual hoisting components meet API 7K. Both standards apply to a complete drilling rig.
Do you provide API 4F certification documentation?
Yes. All our API 4F certified rigs come with complete documentation: (1) structural design calculations, (2) material test reports (MTRs) for structural steel, (3) load test certificates, (4) welding procedure specifications (WPS) and procedure qualification records (PQR), (5) API monogram documentation where applicable. This documentation is essential for operator audits, insurance, and regulatory compliance. Tell us your documentation requirements, and we will provide accordingly.
Can you custom-design a drilling rig?
Yes. We can custom-design drilling rigs to your specific requirements: custom hook load ratings, mast height, substructure design, drive type (mechanical, DC, AC VFD), and auxiliary systems. Our engineering team works with you to design the right rig. Custom rig builds typically take 12–14 months depending on complexity. Tell us your requirements, and we will quote a custom solution.
What's the lead time for a new drilling rig?
Standard API 4F drilling rigs (common sizes) typically take 8–14 months. Larger or custom configurations typically take 14–18 months. Drilling rigs are major capital equipment with long manufacturing cycles. We recommend planning well in advance. Tell us your requirements and timeline, and we will confirm the manufacturing schedule. We also offer used/refurbished rigs for faster delivery.