Workover vs Completion Operations

Workover and completion are both interventions on a well, but they happen at different stages and solve different problems. Mixing them up leads to wrong equipment choices and wasted rig time.

Completion: First Time

Completion is the first time the well is prepared for production. Perforating, gravel packing, installing downhole equipment. Done after drilling and before first production.

Workover: Later in Life

Workover is intervention on an already-producing well. Replacing tubing, fixing sand problems, plugging back, deepening. Done when production declines or equipment fails.

Equipment Differences

Completion rigs often integrated with drilling rig. Workover rigs (XJ series) are smaller, more mobile, designed for rapid rig-up on existing wellheads. Hookload requirements lower than drilling rigs.

Common Workover Jobs

Tubing changeout. Scale and sand cleanout. Plug and abandon. Sidetrack. Water shutoff. Each job has different hookload and pressure requirements.

Planning Considerations

Workover rig selection depends on tubular weight, not just well depth. Budget for rig-up time: onshore workover rigs can rig up in days. Offshore workover requires platform planning months in advance.

Buyer Checklist

Key parameters to confirm before ordering

Related Equipment

Equipment for this application

Need help choosing?

Send us your well program, site conditions, and operating requirements. Our engineers will recommend the right configuration within 48 hours.

Contact Our Engineers

Need Equipment for This Application?

Contact Our Engineers