Workover vs Completion Operations
Workover and completion are both interventions on a well, but they happen at different stages and solve different problems. Mixing them up leads to wrong equipment choices and wasted rig time.
Completion: First Time
Completion is the first time the well is prepared for production. Perforating, gravel packing, installing downhole equipment. Done after drilling and before first production.
Workover: Later in Life
Workover is intervention on an already-producing well. Replacing tubing, fixing sand problems, plugging back, deepening. Done when production declines or equipment fails.
Equipment Differences
Completion rigs often integrated with drilling rig. Workover rigs (XJ series) are smaller, more mobile, designed for rapid rig-up on existing wellheads. Hookload requirements lower than drilling rigs.
Common Workover Jobs
Tubing changeout. Scale and sand cleanout. Plug and abandon. Sidetrack. Water shutoff. Each job has different hookload and pressure requirements.
Planning Considerations
Workover rig selection depends on tubular weight, not just well depth. Budget for rig-up time: onshore workover rigs can rig up in days. Offshore workover requires platform planning months in advance.
Key parameters to confirm before ordering
- Completion: first preparation for production, after drilling
- Workover: intervention on producing well, later in life
- Completion: perforating, gravel pack, downhole equipment
- Workover: tubing replacement, sand control, plugback, deepening