Can a skid mounted workover rig be relocated after installation?
Yes, but it requires a crane and disassembly. The rig must be broken down into its modular components, lifted onto trucks or barges, transported to the new location, and reassembled. This typically takes 1-2 weeks. For frequent moves, a mobile rig is more efficient. For permanent or semi-permanent installations, a skid rig is the better choice.
Do you offer offshore-rated skid workover rigs?
Yes. We offer offshore-rated skid workover rigs with DNV certification, corrosion protection, hazardous area classification and marine-grade materials. These rigs are designed for offshore platform workover operations. We can customize the rig to meet your platform's specific space and weight requirements.
What is the maximum capacity of a skid mounted workover rig?
Our standard skid workover rig lineup goes up to 500 ton lifting capacity. For larger capacity requirements, we can design custom skid rigs based on your specific well conditions and intervention requirements. The exact capacity depends on the well design, tubing weight and operational requirements.
How much does a skid mounted workover rig cost?
The cost depends on capacity and configuration. A 150-ton skid rig may start from USD 500,000-800,000. A 300-ton rig typically costs USD 1-1.5 million. A 500-ton offshore-rated rig can cost USD 2-3 million. Offshore-rated or custom configurations add additional cost. Compare this to a truck-mounted rig at similar capacity —skid rigs are typically 20-30% cheaper due to the absence of a chassis.
What is the lead time for a skid mounted workover rig?
Standard configuration skid workover rigs take approximately 10-15 months from order confirmation. Offshore-rated or custom configurations may require 15-18 months. This includes engineering design, fabrication, load testing and factory acceptance testing. On-site commissioning typically takes 1-2 weeks after delivery.