What is the maximum depth a skid mounted rig can drill?
Our standard skid rig lineup goes up to 8,000-9,000 m. For ultra-deep wells (10,000 m+), we can design custom skid rigs based on your specific well design and drilling parameters. The exact depth capability depends on drill string weight, formation characteristics and wellbore design.
Can a skid mounted rig be relocated after installation?
Yes, but it requires a crane and disassembly. The rig must be broken down into its modular components, lifted onto trucks or barges, transported to the new location, and reassembled. This typically takes 2-4 weeks. For frequent moves, a mobile rig is more efficient. For permanent or semi-permanent installations, a skid rig is the better choice.
Do you offer offshore-rated skid rigs?
Yes. We offer offshore-rated skid rigs with DNV certification, corrosion protection, hazardous area classification and marine-grade materials. These rigs are designed for offshore platform drilling and workover operations. We can customize the rig to meet your platform's specific space and weight requirements.
What is the difference between a skid rig and a land rig?
The terms overlap. A "land rig" typically refers to a rig that operates on land, regardless of mounting type. A "skid mounted rig" specifically refers to a rig that is mounted on a skid base. A skid rig can be used on land or offshore. The key distinction is mobility: skid rigs are not self-propelled, while truck or trailer-mounted rigs are.
What is the lead time for a skid mounted drilling rig?
Standard configuration skid rigs take approximately 15-20 months from order confirmation. Offshore-rated or custom configurations may require 20-24 months. This includes engineering design, fabrication, factory acceptance testing and shipping. On-site commissioning typically takes 2-4 weeks after delivery.