Can a skid mounted CTU be relocated after installation?
Yes, but it requires a crane and disassembly. The skids must be unbolted from the foundation, lifted onto trucks or barges, transported to the new location, and reassembled. This typically takes 3-7 days. For frequent moves, a truck mounted CTU is more efficient. For permanent or semi-permanent installations, a skid CTU is the better choice.
Do you offer offshore-rated skid CTUs?
Yes. We offer offshore-rated skid CTUs with DNV certification, corrosion protection, hazardous area classification and marine-grade materials. These CTUs are designed for offshore platform coiled tubing operations. We can customize the CTU to meet your platform's specific space and weight requirements.
What is the maximum capacity of a skid mounted CTU?
Our standard skid CTU lineup goes up to 2.875" tubing with 120,000 lbf pull force. For larger capacity requirements, we can design custom skid CTUs based on your specific well conditions and intervention requirements. The exact capacity depends on the well design, tubing weight and operational requirements.
How much does a skid mounted CTU cost?
The cost depends on size and configuration. A 2.0" skid CTU may start from USD 800,000-1,200,000. A 2.375" CTU typically costs USD 1.2-1.8 million. A 2.875" heavy-duty CTU can cost USD 2-3 million. Offshore-rated or custom configurations add additional cost. Compare this to a truck mounted CTU at similar capacity —skid CTUs are typically 10-20% cheaper due to the absence of a truck chassis.
What is the lead time for a skid mounted CTU?
Standard configuration skid CTUs take approximately 10-15 months from order confirmation. Offshore-rated or custom configurations may require 15-18 months. This includes engineering design, fabrication, load testing and factory acceptance testing. On-site commissioning typically takes 1-2 weeks after delivery.