XJ450T Trailer-Mounted Workover Rig
Trailer-mounted workover rig, skid chassis towable, faster rig move than truck-mounted units. Designed for professional oilfield service companies and operators who need reliable, field-proven workover equipment that performs consistently under continuous duty.
SJ Petroleum Machinery manufactures this high-pressure workover rig to API standards, with full factory testing before shipment. We provide on-site commissioning, operator training, and global spare parts support tailored to this model.
Key features
Power: Diesel mechanical
The diesel engine and drivetrain are rated for continuous workover rig duty. Critical components (Cummins engine, control system) are sourced from reputable manufacturers with global service support.
Hook load: 450 kN
Hoisting system is designed for heavy-duty workover service with modular components. Field maintenance is straightforward; a trained crew can service the unit in hours, not days.
Operator cabin with data logging
Stand-alone air-conditioned operator cabin with pressure gauges, engine controls, and a data recorder for hook load, block position, and operational parameters. Operators work safely away from high-pressure lines.
Road-legal, single-unit transport
The entire unit is mounted on a standard truck or skid chassis. No disassembly needed for road transport. Drive or tow it to the well location, set up the mast, and start work.
Factory-tested before shipment
Every unit is API-certified (API 7K / API 6A as applicable) and manufactured under our ISO 9001 quality system. Full load testing, function testing, and pressure testing are conducted before leaving the factory. We provide test reports and certification documents with each shipment.
Global spare parts network
We supply spare parts kits, field service engineers, and operator training. Critical spare parts are stocked in our warehouse and shipped within 48 hours of order.
Where this unit fits
This trailer-mounted workover rig for sale is ideal for:
- Mid-depth well workover: Balanced pulling capacity for wells 3000-5000m depth
- Cluster well pads: Trailer design easily relocates between wells on multi-well pads
- Long-distance moves: Towable configuration for inter-field and cross-country transport
- Remote field operations: Road-legal transport for areas where truck-mounted units have access restrictions
XJ450T trailer-mounted — the rig that moves like a fleet, not a truck
The XJ450T is a 450 kN hook load workover rig on a skid chassis towable by a tractor — the trailer format of the 450 kN class. The page states it gives faster rig moves than truck-mounted units: the tractor unhitches and serves other equipment while the rig stays at the pad, and moves are planned as fleet moves.
Choose the trailer-mounted rig when:
- You already own tractors in your fleet. One tractor moves pumps, tanks, and the rig together. Adding a self-propelled truck rig means a second drivable vehicle you do not need.
- Moves are pad-to-pad (every few days to weeks), not daily. Workover jobs last days, so a rig moves every few days or weeks. The trailer format suits this rhythm; daily shuffling would favor a truck.
- You want lower fleet capital cost. A trailer chassis costs less than a truck chassis with cab, engine, and drivetrain. If the tractor already exists, the trailer is the cheaper way to carry the 450 kN rig.
- Hook load 450 kN covers your light-to-mid workover. Same capacity class as the truck version — the choice is chassis format and fleet logistics, not capability.
XJ450T trailer vs XJ450-class truck rig — the logistics difference
- Truck rig: Self-propelled, moves itself anywhere, no tractor coordination. Simpler for single-rig operators.
- XJ450T (this rig): Tractor-based moves, lower chassis cost, frees the tractor for other work between moves. Best for established fleets with tractors.
Operating sequence
The workover operation follows these key steps:
- Rig positioning and rig-up: Workover rig positioned at wellhead, mast raised and secured, BOP stack connected
- Pre-job checks: Operator verifies drawworks, brakes, mast structure, and control system calibration
- Tubing tripping: Drawworks runs in and pulls out tubing or rod string from the wellbore
- Well intervention: Perform well servicing operations such as pump changes, plug setting, or well cleanup
- Rig down and move: After job completion, rig is rigged down and moved to next location
Common selections
- Cold weather package: engine heaters, heated cabin for -30°C winter operations
- Desert package: sand-fill radiators, pre-cleaners, dust-sealed electrical systems
- Electric drive conversion: VFD electric drive for reduced emissions and noise
- Environment-specific customization: tailored to your operating conditions
- Factory-tested package: full load and function testing before shipment
Buyer questions
Q: What is the lead time for a new unit?
A: 6–8 months for a new unit, depending on option list. Refurbished units available in 60–90 days.
Q: Do you supply the complete workover spread?
A: Yes. We can supply workover rigs, flushing units, snubbing units, and auxiliary equipment as a complete package.
Q: Can you customize workover rigs for your site conditions?
A: Yes. We customize workover rigs for ambient temperature, terrain, power supply, and emission regulations. Whether you need desert, cold-weather, or offshore configurations, send your site conditions and we will return a tailored unit configuration.
Q: What is the typical price range for this equipment?
A: Pricing depends on capacity, configuration, and option list. Contact our sales team with your requirements for a detailed quote. We offer factory-direct pricing with no middleman markup.
Q: Do you provide on-site commissioning and operator training?
A: Yes. We provide on-site installation supervision, commissioning, and operator training as part of every package. Our service engineers travel worldwide to support your team during startup and operation.
Manufacturing background
SJ Petroleum Machinery has been building workover rigs since the 1980s, with hook loads from 350 kN to 1500 kN for well servicing and completion operations. Our workover rigs are available in mechanical, hydraulic, and fully electric configurations, customized for desert, arctic, offshore, and urban-fringe environments. We deliver factory-direct equipment to operators in over 30 countries.
Ready to discuss this model?
Send your well program, target depth, hook load requirement, and site conditions. We will return a tailored configuration and pricing within 48 hours.