Workover-Rigs

Automated Workover Rig Package

Automated Workover Rig Package combines workover rig package duties with a packaged layout. Buyers usually check hook load and mast handling, automatic sequence control, and field operation.

Automated Workover Rig Package with roughneck and pipe racking
Product description

Automated Workover Rig Package

Automated workover rig package, iron roughneck, automated catwalk, pipe racker. Designed for professional oilfield service companies and operators who need reliable, field-proven workover equipment that performs consistently under continuous duty.

SJ Petroleum Machinery manufactures this high-pressure workover rig to API standards, with full factory testing before shipment. We provide on-site commissioning, operator training, and global spare parts support tailored to this model.

Technical Highlights

Key features

Power End

Power: Diesel or electric

The diesel engine and drivetrain are rated for continuous workover rig duty. Critical components (Cummins engine, control system) are sourced from reputable manufacturers with global service support.

Hoisting System

Hook load: 350-900 kN

Hoisting system is designed for heavy-duty workover service with modular components. Field maintenance is straightforward; a trained crew can service the unit in hours, not days.

Control

Operator cabin with data logging

Stand-alone air-conditioned operator cabin with pressure gauges, engine controls, and a data recorder for hook load, block position, and operational parameters. Operators work safely away from high-pressure lines.

Mobility

Road-legal, single-unit transport

The entire unit is mounted on a standard truck or skid chassis. No disassembly needed for road transport. Drive or tow it to the well location, set up the mast, and start work.

Build Quality

Factory-tested before shipment

Every unit is API-certified (API 7K / API 6A as applicable) and manufactured under our ISO 9001 quality system. Full load testing, function testing, and pressure testing are conducted before leaving the factory. We provide test reports and certification documents with each shipment.

Service Support

Global spare parts network

We supply spare parts kits, field service engineers, and operator training. Critical spare parts are stocked in our warehouse and shipped within 48 hours of order.

Applications

Where this unit fits

This automated workover rig package for sale is ideal for:

  • High-day-rate campaigns: Automation reduces non-productive time and improves operational efficiency
  • HSE-required automation: Enhanced safety systems for operations with strict HSE requirements
  • Reduced crew size operations: Automated systems minimize on-site crew and operational errors
  • Data-driven workover: Full data recording and reporting for compliance and quality assurance
Selection Guide

Is an automated workover rig package worth it for your servicing program?

The Automated Workover Rig Package (350–900 kN hook load) adds the drilling-rig automation trio — iron roughneck, automated catwalk, pipe racker — to a workover rig. Workover jobs are short, high-frequency operations: pull tubing, change pumps, run back in. On a rig doing 50–100 jobs a year, the time saved per trip adds up fast, and the crew stays off the pipe-handling red zone.

Choose this package when:

  • Your workover program is high-frequency (50+ jobs per year). Automation pays back through repetition. If you service 5 wells a year, the automation premium never recovers; at 50–100 jobs, each saved connection minute compounds.
  • Tripping speed is your bottleneck. Workover economics are dominated by trip time. Iron roughneck cuts connection time roughly 30–40% versus manual tongs, and the automated catwalk keeps pipe moving without crew on the floor.
  • HSE rules require reduced floor crew. Many operators now mandate iron roughnecks on service rigs to prevent hand injuries. If your contract requires it, the package is the compliant answer.
  • Hook load fits your wells: 350–900 kN. Match the rig to your deepest tubing string. Below 350 kN a small flush rig is cheaper; above 900 kN you are in snubbing or drilling-rig territory.

Automated package vs standard workover rig — the real comparison

  • Standard workover rig: Lower cost, manual tongs and catwalk, larger floor crew. Right for low-frequency programs where labor is cheap.
  • Automated package (this rig): Faster trips, smaller crew, HSE compliance, data logging. Pays back on high-frequency programs within the first year of operation.
How It Works

Operating sequence

The workover operation follows these key steps:

  1. Rig positioning and rig-up: Workover rig positioned at wellhead, mast raised and secured, BOP stack connected
  2. Pre-job checks: Operator verifies drawworks, brakes, mast structure, and control system calibration
  3. Tubing tripping: Drawworks runs in and pulls out tubing or rod string from the wellbore
  4. Well intervention: Perform well servicing operations such as pump changes, plug setting, or well cleanup
  5. Rig down and move: After job completion, rig is rigged down and moved to next location
Configuration Options

Common selections

  • Iron roughneck: customized configuration tailored to your field conditions
  • automated catwalk: customized configuration tailored to your field conditions
  • pipe racker: customized configuration tailored to your field conditions
  • closed driller cabin.: customized configuration tailored to your field conditions
  • Automated control system: PLC-based control with touchscreen HMI
  • Data acquisition and recording: real-time monitoring and data logging
FAQ

Buyer questions

Q: What is the lead time for a new unit?
A: 6–8 months for a new unit, depending on option list. Refurbished units available in 60–90 days.

Q: Do you supply the complete workover spread?
A: Yes. We can supply workover rigs, flushing units, snubbing units, and auxiliary equipment as a complete package.

Q: Can you customize workover rigs for your site conditions?
A: Yes. We customize workover rigs for ambient temperature, terrain, power supply, and emission regulations. Whether you need desert, cold-weather, or offshore configurations, send your site conditions and we will return a tailored unit configuration.

Q: What is the typical price range for this equipment?
A: Pricing depends on capacity, configuration, and option list. Contact our sales team with your requirements for a detailed quote. We offer factory-direct pricing with no middleman markup.

Q: Do you provide on-site commissioning and operator training?
A: Yes. We provide on-site installation supervision, commissioning, and operator training as part of every package. Our service engineers travel worldwide to support your team during startup and operation.

Why SJ Petro

Manufacturing background

SJ Petroleum Machinery has been building workover rigs since the 1980s, with hook loads from 350 kN to 1500 kN for well servicing and completion operations. Our workover rigs are available in mechanical, hydraulic, and fully electric configurations, customized for desert, arctic, offshore, and urban-fringe environments. We deliver factory-direct equipment to operators in over 30 countries.

Get a Quote

Ready to discuss this model?

Send your well program, target depth, hook load requirement, and site conditions. We will return a tailored configuration and pricing within 48 hours.

Product Parameters

Parameter table

ItemSpecification
Package scopeWorkover rig + automated pipe handling + iron roughneck + control cabin
Hook load range2250–2500 kN (225–250 t)
AutomationStand building, tripping, pipe racking
FormTruck / trailer / skid, customer-selectable
Related products

More from Workover-Rigs

Cold Weather Workover Rig
Cold-weather-Workover-Rig

Cold-weather-Workover-Rig

Cold Weather Workover Rig is a field-deployable workover rig package for well servicing and pulling. The shortlist starts with hook load and mast handling and the control package.

View details
Desert Workover Rig
Desert-Workover-Rig

Desert-Workover-Rig

Desert Workover Rig suits buyers who need well servicing and pulling in a field-deployable format. Its fit depends on hook load and mast handling and the project duty cycle.

View details
Dual Fastline Workover Rig
Dual-Fastline-Workover-Rig

Dual-Fastline-Workover-Rig

Dual Fastline Workover Rig is a field-deployable workover rig package for well servicing and pulling. The shortlist starts with hook load and mast handling and the control package.

View details
Flushing Workover Rig
Flushing-Workover-Rig

Flushing-Workover-Rig

Flushing Workover Rig suits buyers who need well servicing and pulling in a field-deployable format. Its fit depends on hook load and mast handling and the project duty cycle.

View details
Free Standing Workover Rig
Free-standing-Workover-Rig

Free-standing-Workover-Rig

Free Standing Workover Rig combines workover rig package duties with a field-deployable layout. Buyers usually check hook load and mast handling, field-side control, and field operation.

View details
Full Automatic Workover Rigs
full-automatic-Workover-Rigs

full-automatic-Workover-Rigs

Full Automatic Workover Rigs is a field-deployable workover rig package for well servicing and pulling. The shortlist starts with hook load and mast handling and the control package.

View details