Workover-Rigs

Flushing Workover Rig

Flushing Workover Rig suits buyers who need well servicing and pulling in a field-deployable format. Its fit depends on hook load and mast handling and the project duty cycle.

Well Flushing Workover Rig for paraffin removal and light service
Product description

Flushing Workover Rig

Flushing workover rig, integrated flushing pump, for well flushing and cleaning operations. Designed for professional oilfield service companies and operators who need reliable, field-proven workover equipment that performs consistently under continuous duty.

SJ Petroleum Machinery manufactures this high-pressure workover rig to API standards, with full factory testing before shipment. We provide on-site commissioning, operator training, and global spare parts support tailored to this model.

Technical Highlights

Key features

Power End

Power: Diesel mechanical

The diesel engine and drivetrain are rated for continuous workover rig duty. Critical components (Cummins engine, control system) are sourced from reputable manufacturers with global service support.

Hoisting System

Hook load: 350 kN

Hoisting system is designed for heavy-duty workover service with modular components. Field maintenance is straightforward; a trained crew can service the unit in hours, not days.

Control

Operator cabin with data logging

Stand-alone air-conditioned operator cabin with pressure gauges, engine controls, and a data recorder for hook load, block position, and operational parameters. Operators work safely away from high-pressure lines.

Mobility

Road-legal, single-unit transport

The entire unit is mounted on a standard truck or skid chassis. No disassembly needed for road transport. Drive or tow it to the well location, set up the mast, and start work.

Build Quality

Factory-tested before shipment

Every unit is API-certified (API 7K / API 6A as applicable) and manufactured under our ISO 9001 quality system. Full load testing, function testing, and pressure testing are conducted before leaving the factory. We provide test reports and certification documents with each shipment.

Service Support

Global spare parts network

We supply spare parts kits, field service engineers, and operator training. Critical spare parts are stocked in our warehouse and shipped within 48 hours of order.

Applications

Where this unit fits

This flushing workover rig is designed for:

  • Well flushing operations: High-pressure flushing for wellbore cleaning and sand removal
  • Scale removal: Remove mineral scale and paraffin from production tubing
  • Cleaning operations: Wellbore cleaning before and after workover operations
  • Water injection well workover: Specialized for water injection well maintenance and workover
Selection Guide

Flushing workover rig — the light-duty specialist for well cleaning

The Flushing Workover Rig (350 kN hook load) integrates a flushing pump for well flushing and cleaning operations — paraffin removal, sand washing, and light well servicing. It is the entry-level workover rig: lighter hook load than full-service rigs, but purpose-built for the highest-frequency job in mature fields: keeping wells flowing.

Choose this rig when:

  • Your work is well cleaning, not major recompletion. Paraffin scraping, sand washing, debris removal, and light tubing pulls define its role. If you frequently recomplete or fish heavy equipment, you need a full-size workover rig.
  • Hook load needs are light (up to 350 kN). For shallow-to-mid depth wells and light strings, a 350 kN rig is enough — buying a 750 kN rig for this work wastes capital and fuel.
  • You service many wells per year with short jobs. Flush-and-clean jobs are measured in hours, not days. A lighter, cheaper rig that moves fast and sets up quickly maximizes the number of wells you can service per season.
  • You want a one-unit solution. The integrated flushing pump means you do not bring a separate pump truck for cleaning jobs — the rig carries the pump, hoses, and control in one package.

Flushing rig vs full-size workover rig — matching rig class to job type

  • Full-size workover rig: 450–900 kN, handles recompletions, fishing, heavy pulls. Overkill and overpriced for routine cleaning jobs.
  • Flushing rig (this unit): 350 kN + integrated pump, optimized for cleaning and light service. The cost-efficient choice when cleaning dominates your program.
How It Works

Operating sequence

The workover operation follows these key steps:

  1. Rig positioning and rig-up: Workover rig positioned at wellhead, mast raised and secured, BOP stack connected
  2. Pre-job checks: Operator verifies drawworks, brakes, mast structure, and control system calibration
  3. Tubing tripping: Drawworks runs in and pulls out tubing or rod string from the wellbore
  4. Well intervention: Perform well servicing operations such as pump changes, plug setting, or well cleanup
  5. Rig down and move: After job completion, rig is rigged down and moved to next location
Configuration Options

Common selections

  • Higher pressure flushing pump: customized configuration tailored to your field conditions
  • chemical injection system.: customized configuration tailored to your field conditions
  • Automated control system: PLC-based control with touchscreen HMI
  • Data acquisition and recording: real-time monitoring and data logging
FAQ

Buyer questions

Q: What is the lead time for a new unit?
A: 6–8 months for a new unit, depending on option list. Refurbished units available in 60–90 days.

Q: Do you supply the complete workover spread?
A: Yes. We can supply workover rigs, flushing units, snubbing units, and auxiliary equipment as a complete package.

Q: Can you customize workover rigs for your site conditions?
A: Yes. We customize workover rigs for ambient temperature, terrain, power supply, and emission regulations. Whether you need desert, cold-weather, or offshore configurations, send your site conditions and we will return a tailored unit configuration.

Q: What is the typical price range for this equipment?
A: Pricing depends on capacity, configuration, and option list. Contact our sales team with your requirements for a detailed quote. We offer factory-direct pricing with no middleman markup.

Q: Do you provide on-site commissioning and operator training?
A: Yes. We provide on-site installation supervision, commissioning, and operator training as part of every package. Our service engineers travel worldwide to support your team during startup and operation.

Why SJ Petro

Manufacturing background

SJ Petroleum Machinery has been building workover rigs since the 1980s, with hook loads from 350 kN to 1500 kN for well servicing and completion operations. Our workover rigs are available in mechanical, hydraulic, and fully electric configurations, customized for desert, arctic, offshore, and urban-fringe environments. We deliver factory-direct equipment to operators in over 30 countries.

Get a Quote

Ready to discuss this model?

Send your well program, target depth, hook load requirement, and site conditions. We will return a tailored configuration and pricing within 48 hours.

Product Parameters

Parameter table

ItemSpecification
Hook load1000–1250 kN (light-duty)
FunctionWell flushing / paraffin removal / light workover
Flow rate0.5–1 m³/min flushing pump
FormLight truck-mounted
Related products

More from Workover-Rigs

Automated Workover Rig Package
Automated-Workover-Rig-Package

Automated-Workover-Rig-Package

Automated Workover Rig Package combines workover rig package duties with a packaged layout. Buyers usually check hook load and mast handling, automatic sequence control, and field operation.

View details
Cold Weather Workover Rig
Cold-weather-Workover-Rig

Cold-weather-Workover-Rig

Cold Weather Workover Rig is a field-deployable workover rig package for well servicing and pulling. The shortlist starts with hook load and mast handling and the control package.

View details
Desert Workover Rig
Desert-Workover-Rig

Desert-Workover-Rig

Desert Workover Rig suits buyers who need well servicing and pulling in a field-deployable format. Its fit depends on hook load and mast handling and the project duty cycle.

View details
Dual Fastline Workover Rig
Dual-Fastline-Workover-Rig

Dual-Fastline-Workover-Rig

Dual Fastline Workover Rig is a field-deployable workover rig package for well servicing and pulling. The shortlist starts with hook load and mast handling and the control package.

View details
Free Standing Workover Rig
Free-standing-Workover-Rig

Free-standing-Workover-Rig

Free Standing Workover Rig combines workover rig package duties with a field-deployable layout. Buyers usually check hook load and mast handling, field-side control, and field operation.

View details
Full Automatic Workover Rigs
full-automatic-Workover-Rigs

full-automatic-Workover-Rigs

Full Automatic Workover Rigs is a field-deployable workover rig package for well servicing and pulling. The shortlist starts with hook load and mast handling and the control package.

View details