1. Vertical Drilling
Start with a vertical well drilled down to just above the shale target formation. Uses conventional drilling rigs. The vertical section provides surface access and sets up the horizontal section.
Shale gas and tight oil have transformed the global energy landscape. Development requires a specific set of equipment: horizontal drilling rigs to reach the shale formation, multi-stage hydraulic fracturing to create the fracture network, coiled tubing for well completion and intervention, and production equipment for long-term production. We supply a complete range of equipment for shale gas and tight oil development —from drilling rigs to fracturing spreads to production equipment. Our equipment is proven in major shale plays around the world.
Shale gas development follows a specific sequence:
Start with a vertical well drilled down to just above the shale target formation. Uses conventional drilling rigs. The vertical section provides surface access and sets up the horizontal section.
The wellbore turns 90° and runs horizontally through the shale formation for 1,500–2,000+ meters. Maximizes contact with the shale reservoir. Uses advanced directional drilling technology. This is the key to shale development.
The horizontal well is fractured in 20–30+ stages along its length. Each stage creates a fracture network that releases the gas trapped in the shale. Uses large fracturing spreads (10–20 pump units). This is the heart of shale development.
The well produces for 20–30+ years. Production declines over time. Refracturing (restimulating the well) can restore production. Uses production equipment and later coiled tubing for refracturing. Long-term production optimization.
We supply the full range of shale development equipment:
| Stage | Equipment Required | Key Specs |
|---|---|---|
| Drilling | Land drilling rigs (1,500–2,000 HP), top drive, MWD/LWD | Horizontal capability, 3,000–4,000 m total depth |
| Cementing | Cementing units, cementing heads, plug shooting tools | High-pressure cementing, reliable zonal isolation |
| Fracturing | Frac pump units (2,500–3,000 hp), blenders, data vans, sand handlers | 10,000+ psi treating pressure, 20–30+ stages per well |
| Coiled Tubing | Coiled tubing units, plug setting tools, milling tools | Well cleanout, plug deployment, post-frac intervention |
| Production | Separator, compressor, metering, gathering system | Long-term production, dehydration, compression |
Our shale equipment is suitable for major shale basins:
Marcellus, Permian, Eagle Ford, Bakken, Haynesville, Barnett. The birthplace of shale revolution. Our equipment meets US shale development requirements.
Sichuan Basin (Changning, Weiyuan, Fushun). China's major shale gas play. Our equipment is proven in Chinese shale gas operations.
Vaca Muerta formation —one of the world's largest shale reserves. Major development underway. We supply equipment for Argentine shale projects.
Horn River, Montney, Duvernay. Canadian shale gas and tight oil. We supply equipment for Canadian shale operations.
Saudi Arabia, UAE, Oman —emerging shale gas development. We supply equipment for Middle East shale projects.
Australia, Algeria, Russia, UK. Tell us your shale location, and we will configure accordingly.
Why shale needs specialized equipment:
Multi-stage fracturing needs enormous horsepower: 10–20 frac pump units running simultaneously. Total spread HP: 20,000–30,000+. This is much more than conventional oilfield operations.
Shale fracturing typically operates at 8,000–10,000+ psi treating pressure. All equipment must be rated for these high pressures. Safety margins are critical.
Each frac stage uses 100–200+ tonnes of proppant sand. Total per well: 2,000–10,000+ tonnes. Sand handling, storage, and delivery is a major logistical operation.
Each frac stage uses 1,000–2,000+ cubic meters of water. Total per well: 20,000–100,000+ m³. Water sourcing, treatment, and disposal is a major consideration.
A typical shale frac spread includes 10–20 frac pump units (each 2,500–3,000 hp), one blender, one data van, sand handling equipment, and chemical additive units. Total spread horsepower: 20,000–30,000+ HP. The exact size depends on your stage design, treat rate, and formation characteristics. For US-style shale operations, 15–20 units of 5,000 HP is typical. Tell us your design parameters, and we will recommend the right spread size.
Shale gas produces natural gas (methane) from shale formations. Tight oil produces light oil from low-permeability rock (tight sandstone or shale). Both use the same development process: horizontal drilling + multi-stage fracturing. The main difference is the produced fluid (gas vs. oil), which affects production equipment. The drilling and fracturing equipment is essentially the same. We supply equipment for both shale gas and tight oil development.
Shale wells typically have 20–30+ frac stages along the horizontal lateral. The number depends on: (1) lateral length (longer = more stages), (2) stage spacing (typically 30–50 m per stage), (3) formation characteristics. Longer laterals (2,000–3,000+ m) with closer stage spacing (30 m) = more stages (50+). This maximizes reservoir contact. Tell us your lateral length and stage spacing, and we will help design the fracturing operation.
Yes. We have supplied fracturing and related equipment for Chinese shale gas operations (Sichuan Basin). We understand the specific requirements of Chinese shale development: challenging mountain terrain, high-pressure formations, and specific operator requirements. Tell us your project location and operator, and we will discuss our relevant experience.
Refracturing is restimulating an existing shale well that has declined in production. New fractures are created (or existing ones re-opened) to restore production. Uses similar equipment to initial fracturing. Typically done 3–5 years after initial completion. Can restore 50–70% of initial production. Refracturing is increasingly common as shale wells age. We supply equipment for refracturing operations.
Tell us about your shale project: formation, lateral length, stage design, and equipment needs. Our engineering team will design the right equipment package for your shale development.