What's the difference between the choke manifold and kill manifold?
The choke manifold controls the outflow from the well during well control —it uses an adjustable choke to maintain the right backpressure while mud and formation fluids flow out. The kill manifold controls the inflow —it pumps heavy kill mud (denser than the formation fluid) into the well to increase bottomhole pressure and stop the kick. In a well control operation: you use the choke manifold to control outflow (maintaining pressure), and the kill manifold to pump in heavy mud (building pressure). Both are essential. They're often integrated into a combined "choke and kill manifold" system.
What pressure rating do I need?
The choke and kill manifold pressure rating must match your BOP stack pressure rating. If your BOP stack is 5,000 psi, the choke and kill manifolds should also be 5,000 psi. This is standard practice. Tell us your BOP stack pressure rating, and we will supply matching choke and kill manifolds. We supply all standard pressure ratings: 3,000, 5,000, 10,000, and 15,000+ psi.
Do you supply complete choke and kill manifold systems?
Yes. We supply complete choke and kill manifold systems: choke manifold (with adjustable choke valves), kill manifold (with high-pressure valves and check valves), connecting piping, and control panels. We can supply it as part of a complete well control package (BOP stack + control system + choke/kill manifold). Tell us your requirements, and we will quote the complete system.
What's the difference between manual and hydraulic chokes?
Manual chokes are adjusted by hand from the choke control panel. They're simpler and less expensive. Hydraulic (remote-controlled) chokes can be adjusted from a remote location (like the driller's console) —important for safety during a well control emergency (the operator shouldn't be near high-pressure equipment). Most modern well control systems use hydraulic remote-controlled chokes. We supply both manual and hydraulic choke configurations.
What's the lead time for API 16C manifolds?
Standard API 16C manifolds (common sizes and pressure ratings) typically take 8–14 weeks. Custom configurations or special sizes/pressures typically take 14–20 weeks. Well control equipment is custom-engineered based on your specific requirements. Tell us your requirements and timeline, and we will confirm the manufacturing schedule. We can also discuss expedited options for urgent projects.