What's the difference between a choke manifold and a kill manifold?
The choke manifold controls outflow during well control operations —it routes flow from the well (via the choke line) to the mud/gas separator and flare. It has adjustable chokes for pressure control. The kill manifold is for inflow —it allows heavy kill mud to be pumped into the well (via the kill line) to kill the influx. The choke manifold is the "out" side; the kill manifold is the "in" side. Both are needed for complete well control. We supply both, or combined choke & kill manifolds on one skid.
What pressure rating do I need?
The manifold pressure rating must match the BOP stack rating (they're connected by the choke/kill lines). If you have a 5,000 psi BOP, you need a 5,000 psi manifold. If you have a 10,000 psi BOP, you need a 10,000 psi manifold. The manifold rating must equal or exceed the BOP rating. Tell us your BOP rating, and we will match the manifold rating.
How often do chokes need maintenance?
It depends on the service. In abrasive service (with sand or proppant), choke trim can wear in weeks or months. In clean service, choke trim lasts much longer. We recommend inspecting chokes regularly and keeping spare trim kits on hand. Our chokes use wear-resistant tungsten carbide or ceramic trim for extended life. Tell us your operating conditions, and we will advise on maintenance intervals.
Do you supply spare parts for choke manifolds?
Yes. We supply spare parts for our manifolds: choke trim kits, valve packing, gaskets, seals, pressure gauges, control panel parts. We recommend keeping critical spare parts (choke trim kits, packing sets) on site to minimize downtime. Spare parts are available from inventory or manufactured to order. Tell us what parts you need, and we will quote.
Can you custom-design a manifold configuration?
Yes. We can custom-design manifold configurations to your specific requirements: custom pressure ratings, number of chokes, valve types, control options, skid layout. Our engineering team works with you to design the right configuration. Custom builds typically take 8–16 weeks. Tell us your requirements, and we will quote a custom solution.