What's the difference between API 16A and API 16D?
API 16A covers the BOP equipment itself (the hardware: annular BOP, ram BOP, shear rams). API 16D covers the control system that operates the BOP (hydraulic power unit, accumulators, control panels). In simple terms: API 16A is "the BOP"; API 16D is "the system that controls the BOP." They work together —you need both a BOP (16A) and a control system (16D) for well control. We supply both the BOP stack and the complete API 16D control system as a package.
What BOP configuration do I need?
The BOP stack configuration depends on your well category (depth, pressure). API RP 53 specifies minimum configurations: (1) shallow low-pressure: 1 annular + 1 pipe ram, (2) medium-depth: 1 annular + 2 pipe rams + 1 blind ram, (3) deep high-pressure: 1 annular + 2 pipe rams + 1 blind ram + 1 shear ram, (4) HPHT: 2 annulars + multiple rams. Your drilling engineer will specify the exact configuration. We supply all configurations from basic to heavy-duty.
What pressure rating do I need?
The BOP pressure rating must exceed the expected well pressure. General guidance: (1) shallow low-pressure wells: 2,000–3,000 psi, (2) medium-depth wells: 3,000–5,000 psi, (3) deep high-pressure wells: 5,000–10,000 psi, (4) HPHT wells: 10,000–15,000+ psi. The BOP pressure rating should have some margin above the expected formation pressure. Tell us your well design and expected pressures, and we will recommend the right rating.
Do you supply complete BOP stacks?
Yes. We supply complete BOP stacks configured to your requirements: annular BOP(s), pipe ram BOPs, blind ram BOP, shear ram BOP, spools, crossovers, and connection hardware. We can also supply the complete well control package: BOP stack + API 16D control system + choke manifold + kill manifold. This is a "turnkey" well control solution. Tell us your well parameters, and we will quote the complete system.
What's the lead time for API 16A BOPs?
Standard API 16A BOPs (common sizes and pressure ratings) typically take 8–14 weeks. Custom configurations or special sizes/pressures typically take 14–20 weeks. BOPs are critical safety equipment with strict manufacturing and testing requirements. Tell us your requirements and timeline, and we will confirm the manufacturing schedule. We can also discuss expedited options for urgent projects.