What's the difference between API 7K and API 8C?
API 7K is the broader standard for drilling and well servicing equipment (drawworks, traveling blocks, hooks, swivels, rotary tables, mud pumps). API 8C is specifically for hoisting equipment (traveling blocks, hooks, swivels, elevators, spiders, slips). In practice, the hoisting equipment components need to meet both standards. The distinction is technical —API 8C is the specific hoisting equipment standard. We supply equipment that meets both standards.
What load rating do I need?
The hoisting equipment load rating must match your drilling rig's hook load rating. General guidance: (1) shallow rigs (1,500 m): 150–250 ton, (2) medium-depth rigs (3,000 m): 350–500 ton, (3) deep rigs (5,000 m): 500–750 ton+. The traveling blocks, hooks, swivels, and elevators must all match the rig's hook load rating. Tell us your rig's hook load rating, and we will recommend the right equipment size.
Do you provide proof load test certificates?
Yes. All our API 8C certified hoisting equipment comes with proof load test certificates: (1) material test reports (MTRs) for critical load-bearing components, (2) proof load test certificates (tested to 100–125% of rated load), (3) welding procedure specifications (WPS) and procedure qualification records (PQR), (4) inspection records. This documentation is essential for operator audits and insurance. Tell us your documentation requirements, and we will provide accordingly.
Can you supply spare parts for API 8C equipment?
Yes. We supply spare parts for our API 8C equipment: traveling block sheaves, hook springs, swivel seals, elevator dies, slip elements, etc. We recommend keeping critical spare parts on site to minimize downtime. Spare parts are available from our inventory or manufactured to order. Tell us what parts you need, and we will quote.
What's the lead time for API 8C equipment?
Standard API 8C equipment (common sizes) is typically available from inventory or short lead time (4–6 weeks). Custom configurations or special sizes typically take 12–10 weeks. Tell us your requirements and timeline, and we will confirm availability and lead time. We can also discuss expedited options for urgent projects.