Live Well Intervention
The primary purpose of a snubbing unit is live well intervention. You can run and pull tubing, drill pipe, or casing on a well that is still under pressure —without killing it with heavy mud.
SJ Petroleum Machinery designs and manufactures hydraulic workover (snubbing) units for live well intervention. Our snubbing units handle jointed pipe under pressure —enabling safe work on live, pressurized wells without killing them. Various pressure ratings, pipe sizes, and configurations available for your specific well conditions.
A snubbing unit (hydraulic workover unit) is specialized well control equipment that allows running and pulling jointed pipe on live, pressurized wells —without killing the well.
The primary purpose of a snubbing unit is live well intervention. You can run and pull tubing, drill pipe, or casing on a well that is still under pressure —without killing it with heavy mud.
Unlike coiled tubing (which uses continuous pipe), a snubbing unit handles jointed (threaded) pipe. This means you can use standard oilfield tubulars —2-3/8" tubing, 2-7/8" tubing, drill pipe, etc.
The snubbing unit includes pressure control equipment (BOPs, riser, stripper) that contains well pressure while the pipe is being run or pulled. This is what makes live well work possible and safe.
The unit's hydraulic cylinders apply force to push (snub) pipe into the well when the buoyancy force exceeds pipe weight, and pull pipe out when the pipe is heavier than the upward force. This is how it handles both heavy and light pipe in pressurized wells.
With decades of experience building oilfield well control equipment, we control every step from engineering design to final factory acceptance testing.
We build snubbing units rated for various well pressures —from 35 MPa (5,000 psi) for lower-pressure wells up to 105 MPa (15,000 psi) for high-pressure applications.
Our units handle a wide range of pipe sizes —from 1.315" tubing up to 7" casing. Tell us what tubulars you need to run, and we will recommend the right unit.
We don't just build the jack. We integrate the complete snubbing unit: jack, BOP stack, riser, control console, and power pack —all matched as a single integrated system.
Choose truck-mounted (fast mobilization), trailer-mounted (road-legal, flexible), or skid-mounted (permanent or semi-permanent installations).
All major components are designed and built to API specifications. Third-party inspection can be arranged on request. We provide complete certification documentation.
Our snubbing units operate in onshore oil and gas projects across Central Asia, the Middle East, South America and Africa. We understand export documentation and shipping requirements.
Our standard product line covers the most common snubbing applications. All parameters can be customized for your specific well program and operating conditions.
| Model Class | Working Pressure | Pipe Size Range | Pull Force | Snub Force | Typical Application |
|---|---|---|---|---|---|
| Light-Duty Unit | 35 MPa (5,000 psi) | 1.315"–2-7/8" | 450 kN | 300 kN | Low-pressure well intervention, tubing running |
| Medium-Duty Unit | 70 MPa (10,000 psi) | 1.315"–3-1/2" | 900 kN | 600 kN | General well intervention, workover, completion |
| Heavy-Duty Unit | 70–105 MPa | 1.315"–5-1/2" | 1,350 kN | 900 kN | Heavy pipe, deep wells, high-pressure intervention |
| Ultra-Heavy Unit | 105 MPa (15,000 psi) | 1.315"–7" | 1,800+ kN | 1,200+ kN | Large casing, HPHT wells, ultra-deep intervention |
Our snubbing units are used across a wide range of live well intervention operations.
Running and pulling production tubing on live, pressurized wells. No need to kill the well —saves time, reduces cost, and avoids reservoir damage from kill fluids.
Live well workover operations: downhole tool changes, plug setting, fishing, and through-tubing interventions. Performed without killing the well.
Running completion strings, setting packers, and perforating on live wells. Snubbing units enable safe, efficient completion work on pressurized wells.
Running drillpipe for through-tubing drilling, sidetracking, or underbalanced drilling operations. Snubbing units handle drillpipe under pressure.
Pulling tubing and casing on live wells for plug and abandonment (P&A) operations. Snubbing units enable safe P&A on pressurized wells.
Snubbing units often work alongside coiled tubing units. The snubbing unit handles jointed pipe, while CT handles continuous pipe work —together they cover a wider range of intervention operations.
Browse our standard snubbing unit lineup. All models can be customized to match your project requirements.
A workover rig requires the well to be killed (depressurized) before pulling or running pipe. A snubbing unit can work on live, pressurized wells —you don't need to kill the well. This saves the cost of killing and returning the well to production, and avoids reservoir damage from kill fluids. Snubbing units are more specialized and expensive, but they're the right tool when you need to work on a live well.
The unit's working pressure must be at least equal to the maximum well pressure you will encounter. For most onshore wells, 70 MPa (10,000 psi) is standard. For deeper, higher-pressure wells, you may need 105 MPa (15,000 psi). Tell us your well pressure, and we will recommend the right rating.
Our standard units handle pipe from 1.315" tubing up to 5-1/2" casing. For larger casing sizes, we have heavy-duty units that handle up to 7" casing. Tell us what tubulars you need to run, and we will recommend the right unit configuration.
We supply both complete units and individual components. A complete snubbing unit includes: the jack (hydraulic cylinder assembly), BOP stack, riser, control console, power pack, and support frame. We design the complete unit as a single integrated system, so all components are matched to work together efficiently.
Yes. All major components (BOPs, pressure control equipment, etc.) are designed and built to relevant API specifications. We provide complete documentation: material test reports, certification documents, and a complete FAT test report. Third-party inspection can be arranged on request.
Send us your well pressure, pipe size, and typical intervention operations. Our engineering team will review your project and provide a tailored recommendation with pricing within 48 hours.