Design & Engineering
In-house engineering team that designs CT units from concept to production. 2D/3D CAD, hydraulic system design, structural analysis, control system programming. Custom designs per customer requirements.
Buying coiled tubing equipment from a trading company means you don't know where the equipment is actually made, you can't visit the factory, and quality control depends on someone else's inspection. Buying directly from the factory means you deal with the people who design, build, and test the equipment —no middleman, no markup, direct technical communication. Our factory in Jingzhou, China has been manufacturing oilfield equipment since 1941. We design and build coiled tubing units from the ground up: hydraulic systems, power units, injector heads, reels, control cabins —all assembled and tested in-house. We're API Q1 certified and ISO 9001 certified. You can visit our factory, inspect production, and see exactly how your CT unit is built before it ships.
In-house engineering team that designs CT units from concept to production. 2D/3D CAD, hydraulic system design, structural analysis, control system programming. Custom designs per customer requirements.
CNC machining, welding, steel fabrication, surface treatment. We machine critical components (fluid ends, manifolds, injector parts) in-house. Welding is done by certified welders per API standards.
Complete assembly of CT units in our assembly hall. Factory acceptance testing (FAT): pressure testing, function testing, load testing. Every unit is tested before shipment.
API Q1 quality management system. Incoming material inspection, in-process inspection, final inspection. Non-destructive testing (NDT) for critical welds and pressure components.
| Stage | What Happens | Typical Duration |
|---|---|---|
| 1. Design | Custom design per customer specs, drawing approval | 2-4 weeks |
| 2. Material Procurement | Steel, engines, pumps, hydraulic components sourced | 3-6 weeks |
| 3. Machining & Fabrication | CNC machining, welding, assembly of components | 4-8 weeks |
| 4. Final Assembly | Complete CT unit assembly, hydraulic and electrical connections | 2-4 weeks |
| 5. Testing & Inspection | FAT, pressure testing, customer inspection | 1-2 weeks |
| 6. Shipping Preparation | Surface treatment, packaging, export crating | 1 week |
Absolutely. We welcome customers to visit our factory in Jingzhou, China. You can tour the assembly hall, see CT units in production, meet the engineering team, and inspect components. Many of our export customers visit the factory before placing their first order. If you can't travel, we can arrange a live video tour of the factory. Tell us when you're planning to visit, and we'll arrange everything.
For a standard CT unit (from our existing designs), lead time is typically 3-4 months. For a fully custom unit (special requirements, non-standard specs), lead time is 5-7 months. This includes design, procurement, manufacturing, assembly, and testing. We'll give you a firm timeline in the quotation, and we provide regular production updates (photos and progress reports) throughout the build.
We use branded components for critical systems: engines (Cummins, Caterpillar, Weichai), pumps (API certified fluid ends), hydraulic components (Rexroth, Eaton, or equivalent). We design and build the structural components (reels, injector heads, frames, control cabins) in-house. This gives you the reliability of branded power and hydraulic systems, with the customization of in-house structural design. Tell us your preferred component brands, and we'll specify them in the design.
Tell us your CT unit requirements. We'll design it, build it in our factory, test it, and ship it to you —no middleman, no markup, direct technical support from the people who built it.