Why deep well intervention is different
As wells get deeper, two things rise at the same time: downhole pressure and the weight of the string. A coiled tubing unit that handles shallow cleanout at 2000 m will not reach 4500 m with the pull capacity needed to strip out a stuck string. A snubbing unit rated for medium pressure will not safely control pipe movement on a 70 MPa deep gas well. A workover rig rated at 350 tons will not pull a long, heavy casing string out of a deep hole.
The intervention task itself changes with depth. Shallow wells need cleanout and simple logging. Deep wells need milling, fishing, packer retrieval, stimulation or underbalanced operations, each of which puts a different combination of pull, push, pressure and fluid rate demand on the equipment. Sizing the spread to the actual task matters: over-specify and the project pays for unused capacity, under-specify and the rig cannot do the job when it arrives.