Offshore-Equipment

Jack Up Drilling Rig

Jack Up Drilling Rig suits buyers who need marine drilling and workover in a platform-mounted format. Its fit depends on power arrangement and the project duty cycle.

Jack-Up Offshore Drilling Rig for offshore exploration
Product description

Jack-Up Offshore Drilling Rig

Jack-up offshore drilling rig, mobile offshore drilling unit for shallow to medium water depth. Designed for professional oilfield service companies and operators who need reliable, field-proven equipment that performs consistently under continuous duty.

SJ Petroleum Machinery manufactures this unit to API standards, with full factory testing before shipment. We supply commissioning, operator training, and spare parts support on site.

Technical Highlights

Key features

Power End

Drilling depth: 6000 m

Engine and drivetrain are rated for continuous oilfield duty. All critical components are sourced from reputable manufacturers with global service support.

Main System

Water depth: 30-90 m

Main system is designed for heavy-duty oilfield service with modular components. Field maintenance is straightforward; a trained crew can service the unit in hours, not days.

Control

Operator cabin with data logging

Stand-alone air-conditioned operator cabin with gauges, controls, and a data recorder. Operators work safely away from high-pressure lines.

Mobility

Road-legal, single-unit transport

The entire unit is mounted on a standard truck or skid chassis. No disassembly needed for road transport.

Build Quality

Factory-tested before shipment

Every unit undergoes full function testing, pressure testing, and load testing before leaving the factory. We provide test reports and certification documents with each shipment.

Service Support

Global spare parts network

We supply spare parts kits, field service engineers, and operator training. Critical spare parts are stocked in our warehouse and shipped within 48 hours of order.

Applications

Where this unit fits

Offshore exploration drilling, development wells, platform drilling support.

Selection Guide

Jack-up rig — the mobile drilling unit for shallow to medium water

The Jack-Up Drilling Rig (drilling depth 6,000 m, water depth 30–90 m) is a mobile offshore drilling unit (MODU): the hull is towed to location, the legs are jacked down to the seabed, and the hull lifts clear of the water. It is the workhorse of shallow-to-medium water exploration and development drilling.

Choose the jack-up when:

  • Your water depth is 30–90 m. Jack-ups are the economical MODU choice in this range. Beyond ~90 m, semi-submersibles take over. Within it, jack-ups dominate.
  • You need a mobile rig for multiple locations. The jack-up moves between wells — tow, position, jack down, drill. For a drilling campaign across several locations, the mobile unit avoids installing a rig per platform.
  • 6,000 m drilling depth covers your wells. Match the depth rating to your exploration and development targets. Deeper programs need a bigger class.
  • You want offshore exploration without fixed platform commitment. Before development wells justify a platform, exploration and appraisal wells are drilled by a mobile unit. The jack-up is the standard for this phase.

Jack-up vs fixed-platform rig — mobile versus permanent

  • Fixed-platform (HZJ315DD, 315 t): Installed on the platform, sized to the deck. For development drilling on an existing platform.
  • Jack-up (this rig): Self-elevating mobile unit, 6,000 m depth, 30–90 m water. For exploration and multi-location campaigns.
How It Works

Operating sequence

On arrival at the well site, the unit is positioned and lines are connected. The engine or electric motor is started, warmed up, and ramped up to operating speed. The operator monitors pressure and rate from the control cabin.

Configuration Options

Common selections

DP2 dynamic positioning, upgraded drilling equipment, accommodation module.

FAQ

Buyer questions

Q: What is the lead time for a new unit?
A: 8–10 months for a new unit, depending on option list. Refurbished units available in 90–120 days.

Q: Do you supply the complete system?
A: Yes. We can supply the main unit plus auxiliary equipment as a complete package, engineered to work together.

Q: Can you customize for our site conditions?
A: Yes. We customize for ambient temperature, terrain, power supply, and emission regulations.

Why SJ Petro

Manufacturing background

SJ Petroleum Machinery has manufactured oilfield equipment since the 1980s. Our equipment is API-certified and has shipped to operators in the Middle East, Central Asia, Africa, Southeast Asia, and South America.

Get a Quote

Ready to discuss this model?

Send your project requirements, operating conditions, and site specifications. We will return a tailored configuration and pricing within 48 hours.

Product Parameters

Parameter table

ModelMAx.hookloab kN(lb)Drawworks rated power kw(hp)
SJK450DB4500(100,0000)1470(2000)
SJK675DB6750(150,0000)2200(3000)
SJK900DB9000(200,0000)4413(6000)
Related products

More from Offshore-Equipment

Fixed Platform Workover Rig
Fixed-Platform-Workover-Rig

Fixed-Platform-Workover-Rig

Fixed Platform Workover Rig combines fixed-platform package duties with a platform-mounted layout. Buyers usually check weight, safety and maintenance access, field-side control, and marine work.

View details
HZJ315DD Lightweight Fixed Offshore Drilling Rig
HZJ315DD-Lightweight-fixed-offshore-drilling-rig

HZJ315DD-Lightweight-fixed-offshore-drilling-rig

Hzj315dd Lightweight Fixed Offshore Drilling Rig suits buyers who need marine drilling and workover in a platform-mounted format. Its fit depends on power arrangement and the project duty cycle.

View details
Offshore Cementing Equipment
Offshore-Cementing-Equipment

Offshore-Cementing-Equipment

Offshore Cementing Equipment suits buyers who need marine drilling and workover in a platform-mounted format. Its fit depends on pressure rating and flow capacity and the project duty cycle.

View details
Offshore Equipment
Offshore-Equipment

Offshore-Equipment

Offshore Equipment combines offshore equipment package duties with a platform-mounted layout. Buyers usually check weight, safety and maintenance access, field-side control, and marine work.

View details
Removable Offshore Workover Rig
Removable-Offshore-Workover-Rig

Removable-Offshore-Workover-Rig

Removable Offshore Workover Rig suits buyers who need marine drilling and workover in a platform-mounted format. Its fit depends on weight, safety and maintenance access and the project duty cycle.

View details
SYLQ2000 1050 Fracturing Skid
SYLQ2000-1050-Fracturing-skid

SYLQ2000-1050-Fracturing-skid

Sylq2000 1050 Fracturing Skid combines offshore equipment package duties with a skid-mounted layout. Buyers usually check weight, safety and maintenance access, field-side control, and marine work.

View details