ZJ70DB Continuous-Lifting Drilling Rig, 4500 kN
The ZJ70DB Continuous-Lifting is an AC VFD land rig rated for 4500 kN hook load and 7000 m drilling depth. The "continuous-lifting" designation refers to the double-raise box substructure: the drill floor and cellar beam are raised in a continuous synchronized motion, rather than in two separate steps.
This design is selected for deep wells where BOP stack height is significant (49-1/2" rotary, 7.5 m cellar). The continuous lift avoids the intermediate stopping point of a conventional two-stage substructure, which reduces rig-up time and eliminates the risk of binding during the transition.
Continuous-lifting substructure
Double-raise box, continuous motion
The drill floor and cellar beam rise together in one continuous hydraulic motion from transport height (3 m) to working height (7.5 m). There is no intermediate stop, no re-pinning, no binding risk.
4500 kN for 7000 m wells
Rated hook load 4500 kN (1,012,000 lb), with a 350 t traveling block. Designed for 7000 m onshore oil and gas wells.
AC VFD, two 800 kW motors
The drawworks uses two 800 kW AC motors with VFD, providing stepless speed control and regenerative braking for deep-well trips.
Two F-1600 triplex pumps
Two F-1600 pumps (1600 hp each) handle heavy mud for 7000 m holes. Redundant circulating system.
350 t top drive
A 350 t electric top drive handles continuous rotation while tripping, standard on this rig.
One day for substructure lift
The continuous-lift substructure reaches working height in about 4 hours, compared with 8–12 hours for a conventional two-stage lift. Full rig-up is 2–3 days.
Is the ZJ70DB continuous-lifting rig the right choice for 7,000 m wells?
The ZJ70DB is a 7,000 m-class rig (4,500 kN hook load) with a continuous-lifting substructure. Unlike two-stage lifts that stop, re-pin, and restart, the drill floor and cellar beam rise together in one hydraulic motion from 3 m transport height to 7.5 m working height. This eliminates the binding risk and re-pinning time of conventional box-type substructures.
Choose this rig when:
- Target depth is 6,000–7,000 m. 4,500 kN hook load covers deep production casing and liner running. Below 6,000 m, a ZJ50 rig is cheaper; above 7,000 m you step up to ZJ90.
- Rig-up speed matters on a multi-well deep program. The continuous lift takes roughly half the rig-up time of a conventional two-stage lift, because there is no intermediate stop to re-pin. On a 3–5 well deep program, this saves 2–4 days of rig time total.
- You want to avoid binding risk. Conventional box substructures can bind (jam) during lifting if the two sides rise unevenly. The synchronized continuous-lift system keeps the floor level through the full stroke, which is a real safety and reliability advantage at 7.5 m working height.
- Deep trips need VFD efficiency. Two 800 kW AC motors with regenerative braking recover energy when lowering heavy pipe strings on 7,000 m trips, cutting fuel consumption versus mechanical brakes.
Continuous-lift ZJ70DB vs conventional two-stage ZJ70 — is it worth the premium?
- Conventional two-stage ZJ70: Lower upfront cost, proven design, but slower rig-up (stops to re-pin) and a small binding risk if cylinders are not perfectly synchronized.
- Continuous-lift ZJ70DB (this rig): Higher upfront cost, faster rig-up, no binding risk, synchronized lift. Best for operators who move frequently between deep wells and count rig-up hours in the cost model.
Buyer questions
Q: How is this different from a standard ZJ70D?
A: Same hook load and depth rating, but the substructure is the continuous-lift double-raise type instead of a conventional box substructure. The substructure raises faster and has no intermediate pinning.
Q: When is continuous-lift worth the extra cost?
A: On 7000 m wells where BOP height is 7.5 m or more. For shallower wells with lower cellar requirements, a conventional substructure is sufficient.
Q: What is the typical price range for this equipment?
A: Pricing depends on capacity, configuration, and option list. Contact our sales team with your requirements for a detailed quote. We offer factory-direct pricing with no middleman markup.
Q: Do you provide on-site commissioning and operator training?
A: Yes. We provide on-site installation supervision, commissioning, and operator training as part of every package. Our service engineers travel worldwide to support your team during startup and operation.
Q: What is the typical delivery lead time?
A: 6–8 months for new equipment, depending on configuration. Refurbished or stock units can ship in 60–90 days. Contact us for your specific model lead time.
Ready to discuss this rig?
Send your target depth, BOP stack height, and well profile. We will return a layout and pricing within 48 hours.