Standard CT Units
1 to 2-3/8 inch tubing, 3000-5000m depth. The workhorse of well intervention: cleanouts, acidizing, plug milling. Truck-mounted for mobile operations.
Coiled tubing (CT) is continuous steel pipe spooled on a large reel —run into the well without making connections. It's the most versatile well intervention tool: you can pump fluid through it, run logging tools on it, mill plugs with it, or deploy chemicals through it. CT units range from small 1-inch capillary units for chemical injection to large 3.5-inch heavy-duty units for deep intervention and CT drilling. We design and manufacture coiled tubing units for every application: well cleanout, acid stimulation, plug milling, live well intervention, CT drilling, and capillary injection. Available in truck-mounted, trailer-mounted, skid-mounted, and offshore configurations. Every unit is custom-sized to your well depth, tubing diameter, and pressure requirements.
1 to 2-3/8 inch tubing, 3000-5000m depth. The workhorse of well intervention: cleanouts, acidizing, plug milling. Truck-mounted for mobile operations.
2-3/8 to 3-1/2 inch tubing, deeper depth, higher pull force. For deep wells, large intervention, and CT drilling operations.
Skid-mounted, compact, marine-grade. For platform and floating rig well intervention. Module breakdown for crane lift.
1/4 to 3/8 inch small-bore tubing. For chemical injection, downhole monitoring, wax control. Lightweight, precision deployment.
| Application | Tubing Size | Typical Depth |
|---|---|---|
| Sand Cleanout | 1.5" - 2.375" | 2,000 - 4,000 m |
| Acid Stimulation | 1.5" - 2.375" | 2,000 - 5,000 m |
| Plug Milling | 2.375" - 2.875" | 3,000 - 6,000 m |
| CT Drilling | 2.875" - 3.5" | 4,000 - 6,000 m+ |
| Chemical Injection | 0.25" - 0.375" (capillary) | 1,000 - 3,000 m |
Three key factors: (1) well depth —deeper wells need larger tubing and higher pull capacity, (2) job type —cleanouts need smaller tubing, milling needs larger tubing, (3) well pressure —live well jobs need higher pressure BOPs. Tell us your well conditions and the jobs you plan to do, and we'll recommend the right CT unit size.
CT uses continuous pipe on a reel —fast, no connections, but limited to smaller diameters. Workover rigs use jointed pipe —can handle larger pipe and heavier loads, but slower because you make and break connections. For most routine intervention (cleanout, acidizing), CT is faster and cheaper. For heavy work (pulling tubing, running completions), a workover rig is needed.
Yes. We manufacture offshore CT units —skid-mounted, compact, marine-grade, explosion-proof. Designed for platform deck space and crane lift weight limits. We provide lifting plans, weight certificates, and marine certification documentation.
Tell us your well depth, tubing size, application, and mounting preference. We'll design and build a custom CT unit —truck, trailer, skid, or offshore —built for your specific intervention jobs.