Platform Intervention | Offshore Well Service

Offshore Coiled Tubing Unit for Platform Well Intervention

An offshore coiled tubing unit is a well intervention system designed for deployment on offshore oil and gas platforms. It must operate in the harsh marine environment, fit within limited platform space, and meet stringent safety and regulatory requirements for offshore operations.

Offshore coiled tubing unit on oil platform

What Makes Offshore CT Different?

Offshore coiled tubing operations present unique challenges compared to onshore operations:

Limited Deck Space

Offshore platforms have extremely limited deck space. Every piece of equipment must fit within the available footprint. The CTU must be compact and modular, with components that can be lifted and positioned individually by the platform's crane.

Harsh Marine Environment

Salt spray, humidity, and extreme weather accelerate corrosion. All equipment must be made from corrosion-resistant materials or have protective coatings. Electrical systems must be sealed against moisture and salt ingress. Equipment must withstand tropical storms, hurricanes, and other extreme weather events.

Hazardous Area Classification

Offshore platforms have hazardous areas where explosive gas may be present. Electrical equipment must be rated for the appropriate hazardous area classification (Zone 1, Zone 2, Division 1, Division 2). Explosion-proof enclosures, intrinsically safe circuits, and sealed junction boxes are required.

Strict Safety Regulations

Offshore operations are subject to strict safety regulations (DNV, API, local regulatory bodies). Equipment must meet these standards. Personnel must be trained in offshore safety procedures (BOSIET, HUET, etc.). There is no quick evacuation option offshore.

Logistics Challenges

Moving equipment to and from offshore platforms requires supply vessels or helicopters. Everything must be packaged and transported by sea or air. Spare parts and consumables must be staged carefully. A broken part can halt operations for days or weeks.

Crew Accommodation

The CT crew lives on the platform for the duration of the operation. The rig must be designed for crew comfort and safety in a remote offshore environment. Platform living quarters may be limited, so crew size must be minimized.

Types of Offshore Coiled Tubing Units

There are several configurations of offshore CTUs, depending on the platform type and well requirements:

Platform CTU (Skid-Mounted)

The most common configuration. A skid-mounted CTU that is lifted onto the platform by crane and installed at the well slot. Designed to fit within the platform's deck space. Used for routine well intervention and workover operations. Typically uses 1.5" - 2.0" tubing.

CT Vessel (Spread-Moored or DP)

A larger CTU installed on a vessel (ship or barge). Used for subsea well intervention or for platforms without deck space. The vessel positions itself above the subsea well and performs CT operations through a riser. Much larger scale than platform CTUs.

Subsea CT Intervention

For subsea wells without a surface platform, CT operations are performed from a vessel or rig. The CTU is deployed through a riser to the subsea wellhead. This requires specialized equipment and significant engineering support.

Offshore CTU Model Range

Our offshore coiled tubing unit lineup is designed for platform installation. All models meet DNV and API standards for offshore use:

Model Tubing OD Pull Force Pressure Rating Footprint (Approx.)
SCO150 1.5" (38.1 mm) 60,000 lbf (267 kN) 70 MPa (10,000 psi) 6 m x 8 m
SCO175 1.75" (44.5 mm) 70,000 lbf (311 kN) 70 MPa (10,000 psi) 7 m x 10 m
SCO200 2.0" (50.8 mm) 80,000 lbf (356 kN) 105 MPa (15,000 psi) 8 m x 12 m

Key Features of Our Offshore CTUs

Compact, Skid-Mounted Design

Our offshore CTUs are built on a compact skid base designed to fit within typical offshore platform deck dimensions. The modular design allows for rig-up and rig-down using the platform's crane. Components can be lifted and positioned individually.

Marine-Grade Corrosion Protection

All our offshore CTUs come with marine-grade corrosion protection: hot-dip galvanized structural components, epoxy coatings on all exposed surfaces, and stainless steel fasteners. Designed to withstand the harsh marine environment for decades without major corrosion issues.

Hazardous Area Rated

Electrical systems are rated for hazardous areas (Zone 1 / Division 1 as required). Explosion-proof enclosures, intrinsically safe circuits, and sealed junction boxes are standard. Meets IECEx / ATEX / API RP 14F requirements for offshore hazardous area operations.

DNV Certified

Our offshore coiled tubing units are designed and certified in accordance with DNV-ST-0378 (Offshore Standard) and other relevant offshore standards. Third-party verification is available upon request. We work with DNV, ABS, and Lloyd's Register for certification.

Integrated Well Control

The CTU comes with a complete BOP stack rated for offshore well control: annular BOP, pipe rams, blind rams, shear rams, and stripper. All rams are hydraulically operated with accumulator backup. Meets API 16A standards.

Enhanced Safety Systems

Comprehensive safety systems: load monitoring with overload protection, emergency stop circuits, tubing fatigue monitoring, depth accuracy verification, and real-time data recording. Safety is paramount offshore —there is no second chance.

Applications of Offshore CTUs

Sand Cleanout

One of the most common offshore applications: using coiled tubing to wash out sand and debris from production wells. Offshore wells often suffer from sand production, which reduces flow rates. CT cleanout restores production without pulling the completion string.

Matrix Stimulation

Acidizing offshore wells through coiled tubing. The CTU spots the acid precisely at the target zone, improving stimulation effectiveness. This is critical for offshore wells where conventional bullheading would be less efficient and more costly.

Well Logging

Logging tools run on coiled tubing to gather downhole data: temperature, pressure, cement bond, production logging. CTU logging is faster than conventional wireline logging and can be performed on live wells. Critical for offshore wells where data gaps can cost millions.

Gas Lift Valve Change

For gas lift wells, coiled tubing retrieves and resets gas lift valves. This avoids the need to pull the completion string, saving rig time and cost. Offshore rig time is extremely expensive —CTU interventions are much cheaper than full workover.

Frequently Asked Questions About Offshore CTUs

What is the difference between onshore and offshore coiled tubing units?

Offshore CTUs are designed for the harsh marine environment: they have corrosion protection, hazardous area electrical ratings, and compact skid-mounted designs that fit on platform decks. Onshore CTUs are typically truck or trailer-mounted and do not require the same level of corrosion protection or hazardous area certification. Offshore CTUs also need to meet DNV and other offshore regulatory standards.

How is an offshore CTU transported to the platform?

Offshore CTUs are typically transported by supply vessel (PSV) or heavy lift ship. The CTU is broken down into skid-mounted modules that can be lifted onto the platform by the platform's crane. For remote or small platforms, some components may be transported by helicopter if they can be broken into small, light loads.

What is the typical cost of an offshore CTU?

The cost depends on size and configuration. A 1.5" offshore CTU may start from USD 800,000-1,200,000. A 2.0" offshore CTU typically costs USD 1.5-2.5 million. This includes the skid-mounted base, VFD electric drive, BOP stack, control cabin, and all safety systems. Offshore certification (DNV, hazardous area) adds additional cost. The rental cost for an offshore CTU is typically USD 25,000-50,000 per day, depending on size and location.

How long does a typical offshore CT campaign take?

A typical offshore CT intervention takes 1-3 days per well, depending on the complexity of the operation. This includes rig-up on the platform, the CT operation itself, and rig-down. Multi-well campaigns on a single platform can take 1-2 weeks. Mobilization and demobilization (transporting the CTU to and from the platform) add additional time and cost.

Can you customize an offshore CTU for my platform?

Yes. We regularly customize offshore CTUs to fit specific platform dimensions, weight limits, and interface requirements. Provide us with your platform's deck dimensions, crane capacity, well slot layout, and interface requirements, and we will design a CTU that fits. We also provide engineering support for rig-up planning and installation.

Need an Offshore Coiled Tubing Unit?

Tell us your platform type, well depth and intervention requirements. Our engineering team will recommend the optimal offshore CTU configuration and provide a detailed quotation within 48 hours.