How much does a workover rig cost per day?
Workover rig day rates vary by rig size, location and market conditions. A typical 100-ton truck mounted workover rig runs $5,000-$15,000 per day. Larger rigs (200+ tons) cost $15,000-$30,000 per day. The day rate includes the rig, crew and basic consumables. Additional costs (tubing, fluids, logging) are charged separately. Contact us for a specific quote based on your well and work scope.
How long does a typical workover job take?
A simple workover (pulling tubing, changing a pump) takes 1-3 days. A more complex workover (running a new completion, sidetracking) takes 1-4 weeks. The duration depends on the well depth, the work scope, and any unexpected issues encountered. Planning for 2-5 days for a typical well repair is reasonable. Always add contingency time for surprises —downhole conditions are unpredictable.
What is the difference between workover and well servicing?
They're often used interchangeably, but there's a subtle difference. "Well servicing" is the broader term that includes all well maintenance and intervention activities. "Workover" specifically refers to the more involved interventions that require pulling tubing —like pump changes, completion replacements, and well repairs. Routine well maintenance (chemical treatments, gauge changing) is usually called "well servicing" but not "workover."