Project background
An Algerian operator ordered a ZJ70D drilling rig for a desert concession in the Sahara. The field sits in one of the harshest drilling environments onshore: summer ground temperature exceeds 60 C, fine sand and dust are constant, water supply is limited, and well pads are reached by temporary tracks rather than paved roads. A standard ZJ70D specification would struggle in these conditions.
The operator needed the rig to drill through the full summer season without overheating, without dust-related breakdowns, and without consuming water faster than the supply line could deliver it. The rig also had to move between remote pads quickly, because the crew was exposed to extreme conditions the entire time the rig was standing.