Equipment Packages

Coiled Tubing Intervention Package

A coiled tubing unit is only the starting point. To run proper well intervention, you also need BOPs, pumping units, and downhole tools. We provide complete CT intervention packages —everything you need to start working.

What's Included

Components of a Complete CT Intervention Spread

A full coiled tubing intervention spread includes several key components:

Core Equipment

Coiled Tubing Unit

The CT injector, reel, and control cabin. Sized to your pull force requirements (60–450 kN) and tubing diameter (1-1/4" to 2-7/8"). This is the heart of the intervention spread.

View CT Units
Well Control

BOP Stack

Blowout preventer stack for safe intervention under pressure. Critical for high-pressure wells and sour service applications. Includes shear rams, pipe rams, and an annular preventer.

View BOPs
Pumping

High-Pressure Pumping Unit

Hydraulic power unit (HPU) and high-pressure pump for circulating fluids, jetting, and stimulation. Needed for cleanout, acid jobs, and milling operations.

View Pumping Units
Tools

Downhole Tools

Jetting nozzles, mills, logging tools, and downhole cameras. The right tools make the difference between a successful intervention and a costly failure. We supply a full range of CT tools.

Ask About Tools
Package Configurations

Sized for Different Intervention Types

We offer different package configurations depending on the type of intervention you run:

Light Intervention

Cleanout & Light Intervention Package

For sand cleanout, acidizing, and logging in shallow wells:

  • Light CT unit (60–120 kN pull)
  • Standard BOP stack
  • Basic pumping unit
  • Jetting nozzles and basic tool set

Perfect for operators bringing light intervention in-house.

Medium Intervention

General Intervention Package

For general well intervention work —cleanout, milling, stimulation:

  • Medium CT unit (180–450 kN pull)
  • High-pressure BOP stack
  • High-rate pumping unit
  • Full tool set (mills, jets, logging tools)

Most versatile configuration —handles 80% of intervention jobs.

Heavy Intervention

Deep & High-Pressure Package

For deep wells, high-pressure operations, and heavy milling:

  • Heavy CT unit (350–450 kN pull)
  • Full BOP stack with shear rams
  • High-pressure high-rate pumping unit
  • Complete tool suite for all intervention types

Designed for deep wells, HPHT formations, and sour service.

Need a complete CT intervention spread?

Tell us your typical well depth, what kind of intervention you run most often, and whether you work under pressure. We will recommend the right package configuration.

Get a Custom Package Quote