Electric-driven skid units are standard on offshore drilling platforms. They eliminate diesel exhaust, reduce deck footprint and integrate with the platform's central power and control systems.
A skid mounted cementing unit consolidates pump, mixing system and controls onto a single steel frame. It is designed for installation on offshore platforms, drilling rig mud pits and permanent wellsites where road mobility is not required.
The choice between a skid unit and a truck unit depends on your operating location, mobility requirements and space constraints. Here is a direct comparison:
| Factor | Skid-Mounted Unit | Truck-Mounted Unit |
|---|---|---|
| Primary Use Case | Offshore platform, permanent wellsites, drilling rig integration | Mobile onshore operations, multi-well locations, workover fleets |
| Mobility | Requires crane for lifting, not road-mobile | Self-propelled, road-ready between locations |
| Footprint | Compact, optimized for platform space constraints | Larger, includes chassis and cab |
| Drive Options | Electric motor (VFD) preferred for offshore/zero-emission sites | Diesel engine (Cummins/Weichai) standard |
| Installation | Bolted down to deck or foundation, connected to utilities | Drive-on, connect hoses and power, ready to work |
| Cost | Lower than truck (no chassis/cab cost) | Higher (includes truck chassis and licensing) |
| Best For | Offshore rigs, desert camps, remote permanent fields | Contractor fleets, multi-well pads, mobile workover |
Our skid-mounted cementing lineup covers pressure ratings from 15 MPa to 38 MPa, with both diesel and electric drive options. All units include DNV-rated lifting lugs for offshore installation.
| Model | Working Pressure | Max Displacement | Drive Type | Typical Application |
|---|---|---|---|---|
| SGJ600 Skid | 21 MPa (3,045 psi) | 2.6 m³/min | Diesel / Electric VFD | Platform cementing, medium-depth wells |
| SGJ1000 Skid | 21 MPa (3,045 psi) | 2.6 m³/min | Diesel / Electric VFD | Deep well cementing on fixed rig |
| SGJ1600 Skid | 28 MPa (4,060 psi) | 2.8 m³/min | Electric VFD preferred | HPHT wells, offshore deepwater |
| SGJ2500 Skid | 38 MPa (5,510 psi) | 3.2 m³/min | High-power electric / diesel | Ultra-deep, sour service offshore |
| SHJC16 Batch Mixer Skid | —/td> | 1.6 m³ batch volume | Electric / Diesel | Continuous slurry preparation on platform |
Skid-mounted cementing units are preferred in locations where mobility is not required and space or emission constraints favor a fixed installation.
Electric-driven skid units are standard on offshore drilling platforms. They eliminate diesel exhaust, reduce deck footprint and integrate with the platform's central power and control systems.
On semi-submersible and drillship rigs, high-pressure skid cementing units are installed in the mud pit area. They must meet strict DNV lifting and stability requirements.
In mature oilfields with fixed infrastructure, skid units are bolted to concrete foundations. They serve multiple wells from a central cementing station.
Electric VFD skid units produce zero on-site emissions, making them suitable for nature reserves, urban proximity projects and low-emission regulatory zones.
Browse our standard skid-mounted cementing units. Every model can be customized for your platform layout, power availability and regulatory requirements.
VFD electric drive, zero emissions, suitable for offshore platform installation.
1.6 m³ batch mixing system, skid-mounted for continuous slurry preparation.
Pneumatic bulk cement storage and transfer system, skid-mounted for remote sites.
All components are arranged to minimize platform footprint. We provide 3D layout drawings and interface drawings before fabrication starts.
Every skid includes DNV-certified lifting lugs and a center of gravity calculation, essential for offshore crane installation.
Our VFD electric drive skid units integrate with platform power systems. We provide motor sizing, harmonic analysis and control interface documentation.
Pump module, mixing module and control module are separate skids that can be transported and installed independently.
For offshore service, we provide epoxy coating, stainless steel piping and cathodic protection options for long-term saltwater exposure.
Each skid unit undergoes a full pressure hold test, functional test and electrical integration test before shipment. Your inspection team is welcome to witness FAT.
A typical 21 MPa skid cementing unit weighs between 12 and 18 tonnes depending on configuration. The lifting lugs are designed for this weight plus a 1.5x safety factor. We provide detailed lifting plans, center of gravity data and rigging diagrams for your installation engineer.
Technically yes, but it is rarely cost-effective. The pump, mixing system and control cabinet are the same; the difference is the frame and integration with chassis systems. If you need both mobility and fixed installation, we recommend a trailer-mounted unit —it provides road mobility and can be parked and connected like a skid unit.
Yes. Our VFD (variable frequency drive) electric skid units are designed for offshore use. They connect to the platform's 440V or 690V power system, produce zero on-site emissions and integrate with the platform's central control network. We provide full electrical documentation and harmonic analysis on request.
We provide interface drawings showing all connection points: power supply, control signals, water supply, discharge line, ventilation and drainage. Your platform engineer reviews these before fabrication to ensure compatibility with your existing systems.
Standard skid units take approximately 6–8 months. Offshore-rated custom units with DNV certification, special materials or electric drive typically require 9–12 months from order confirmation to delivery, including engineering design, fabrication, FAT and shipping.
Send us your platform layout, power availability and pressure requirements. Our engineering team will provide a 3D layout proposal and detailed quotation within 5 working days.