Cementing-Equipment

SGJ600 30 Full Auto Cementing Truck

Sgj600 30 Full Auto Cementing Truck suits buyers who need slurry mixing and placement in a truck-mounted format. Its fit depends on pressure and displacement control and the project duty cycle.

SGJ600-30 Fully Automatic Cementing Truck, 30MPa, automated slurry control
Product description

SGJ600-30 Full-Auto Cementing Truck

Full-automatic cementing truck, one-button operation, automatic mixing, automatic pumping, automatic recording. This 600 hp cementing unit (30 MPa working pressure) is designed for professional oilfield service companies who need reliable, field-proven cementing equipment that performs consistently under continuous well cementing duty.

SJ Petroleum Machinery manufactures this 30 MPa cementing unit to API 6A standards, with full factory pressure and flow testing before shipment. We provide on-site commissioning, operator training, and global spare parts support tailored to this model.

Technical Highlights

Key features

Power End

Power: 600 hp

The 600 hp diesel engine and drivetrain are rated for continuous cementing pump duty. Critical components (Cummins engine, Siemens control system) are sourced from reputable manufacturers with global service support.

Fluid End

Working pressure: 30 MPa (4,350 psi)

Fluid end is designed for high-pressure service with modular valve seats and quick-change components. Field maintenance is straightforward; a trained crew can service the pump in hours, not days.

Control

Operator cabin with data logging

Stand-alone air-conditioned operator cabin with pressure gauges, engine controls, and a data recorder for treating pressure, rate, and density. Operators work safely away from high-pressure lines.

Mobility

Road-legal, single-unit transport

The entire unit is mounted on a standard truck or skid chassis. No disassembly needed for road transport. Drive or tow it to the well location, connect hoses, and start work.

Build Quality

Factory-tested before shipment

Every unit is API-certified (API 7K / API 6A as applicable) and manufactured under our ISO 9001 quality system. Full pressure testing, load testing, and function testing are conducted before leaving the factory. We provide test reports and certification documents with each shipment.

Service Support

Global spare parts network

We supply spare parts kits, field service engineers, and operator training. Critical spare parts are stocked in our warehouse and shipped within 48 hours of order.

Applications

Where this unit fits

This 600 hp, 30 MPa fully automatic cementing truck for sale is ideal for:

  • Large-scale cementing operations: Full automation reduces labor requirements for high-volume cementing programs
  • High-quality requirement projects: Closed-loop control ensures consistent slurry density and placement accuracy
  • Reduced manpower operations: Automated system minimizes on-site crew size and operational errors
  • Data-driven cementing: Full data recording and reporting for compliance and quality assurance
Selection Guide

Is SGJ600-30 the right model for your well?

The SGJ600-30 is a 600 hp, 30 MPa fully automatic cementing truck. It is designed for service companies running 2,000–3,500 m intermediate casing jobs where consistent slurry density and data logging are required.

Choose this model when:

  • Well depth: 2,000–3,500 m — 30 MPa working pressure covers intermediate and production casing cementing in this depth range.
  • Cement volume: 15–30 m³ per stage — The 1.5 m³ mixing tank plus continuous feed system handles typical intermediate casing jobs without stopping.
  • Automation requirement: high — One-button mixing and pumping reduces operator error and keeps slurry density within ±0.03 g/cm³ of target.
  • Data compliance: required — Built-in data recorder logs pressure, rate, and density for each stage, with PDF export for well operator submission.

SGJ600 vs SGJ800 — which to choose?

  • SGJ600-30 (this model): 600 hp, 30 MPa. Best for 2,000–3,500 m wells, smaller footprints, and lower operating cost per job.
  • SGJ800-35: 800 hp, 35 MPa. Choose for 3,500–5,000 m deep wells or high-pressure gas wells where 30 MPa is not enough.
How It Works

Operating sequence

The cementing operation follows these key steps:

  1. Site positioning: Truck or skid unit positioned at wellhead, suction and discharge lines connected
  2. Pre-job checks: Operator verifies fluid end condition, safety valves, and control system calibration
  3. Mix preparation: Mixing system prepares cement slurry to target density and specifications
  4. Pumping stage: Pump delivers slurry at controlled rate and pressure, operator monitors real-time data
  5. Displacement: After cement slurry, displacement fluid pushes cement to target depth
Configuration Options

Common selections

  • Remote monitoring system: real-time equipment status monitoring from anywhere
  • Data cloud platform integration: upload operation data to cloud for analysis
  • Unmanned operation capability: automated control with minimal on-site personnel
  • Video surveillance option: on-site camera system for remote visual monitoring
  • Automated alert system: email/SMS alerts for abnormal conditions
FAQ

Buyer questions

Q: What is the lead time for a new unit?
A: 6–8 months for a new unit, depending on option list. Refurbished units available in 60–90 days.

Q: Do you supply the complete cementing spread for oil well cementing?
A: Yes. We can supply complete cementing spreads for oil well cementing operations: cementing trucks, batch mixers, cement tanks, and additive systems as a package, engineered to work together for onshore and offshore oilfield projects.

Q: Can you customize cementing units for deep well and high-pressure operations?
A: Yes. We customize cementing units for ambient temperature, terrain, power supply, and emission regulations. Whether you need desert, cold-weather, or offshore configurations, send your site conditions and we will return a tailored cementing truck configuration.

Q: What is the typical price range for this equipment?
A: Pricing depends on capacity, configuration, and option list. Contact our sales team with your requirements for a detailed quote. We offer factory-direct pricing with no middleman markup.

Q: Do you provide on-site commissioning and operator training?
A: Yes. We provide on-site installation supervision, commissioning, and operator training as part of every package. Our service engineers travel worldwide to support your team during startup and operation.

Why SJ Petro

Manufacturing background

SJ Petroleum Machinery has been manufacturing cementing equipment since the 1980s, with over 500 cementing units delivered to oilfield operators in the Middle East, Central Asia, Africa, and Southeast Asia. Our cementing trucks and skids are API-certified and customized for well depths ranging from shallow to ultra-deep wells. We provide factory-direct pricing, global after-sales support, and on-site commissioning for your cementing operations.

Get a Quote

Ready to discuss this model?

Send your well program, target pressure, flow rate requirement, and site conditions. We will return a tailored configuration and pricing within 48 hours.

Product Parameters

Parameter table

ModelMax. working pressure MPa(psi)Pump typeMax. flow rate m³/minMixing tank L(gal)Water tank L(gal)Drive / mounting
SGJ600-30 (GJC100-30)30(4,350)Single 3-cylinder plunger pump1.61000(264)10000(2,642)Diesel, 8×8 truck, fully automated closed-loop mixing
Related products

More from Cementing-Equipment

Cement Tank And Bulk System
Cement-tank-and-bulk-system

Cement-tank-and-bulk-system

Cement Tank And Bulk System suits buyers who need slurry mixing and placement in a field-deployable format. Its fit depends on pressure and displacement control and the project duty cycle.

View details
Continuous Liquid Additive System
Continuous-liquid-additive-system

Continuous-liquid-additive-system

Continuous Liquid Additive System combines cementing package duties with a field-deployable layout. Buyers usually check pressure and displacement control, continuous-load control, and field operation.

View details
SGJ1000 21 Single Pump Cementing Truck
SGJ1000-21-Single-pump-cementing-truck

SGJ1000-21-Single-pump-cementing-truck

Sgj1000 21 Single Pump Cementing Truck is a truck-mounted mobile cementing spread for slurry mixing and placement. The shortlist starts with pressure and displacement control and the control package.

View details
SGJ1600 28 Single Pump Cementing Truck
SGJ1600-28-Single-pump-cementing-truck

SGJ1600-28-Single-pump-cementing-truck

Sgj1600 28 Single Pump Cementing Truck suits buyers who need slurry mixing and placement in a truck-mounted format. Its fit depends on pressure and displacement control and the project duty cycle.

View details
SGJ2500 38 High Power Cementing Truck
SGJ2500-38-High-power-cementing-truck

SGJ2500-38-High-power-cementing-truck

Sgj2500 38 High Power Cementing Truck is a truck-mounted mobile cementing spread for slurry mixing and placement. The shortlist starts with pressure and displacement control and the control package.

View details
SGJ350 25 Twin Pump Cementing Truck
SGJ350-25-Twin-pump-cementing-truck

SGJ350-25-Twin-pump-cementing-truck

Sgj350 25 Twin Pump Cementing Truck combines mobile cementing spread duties with a truck-mounted layout. Buyers usually check pressure and displacement control, field-side control, and field operation.

View details