SGJ350-25 Twin Pump Cementing Truck
Twin pump cementing truck, two 350 hp pumps in parallel, high flow rate for long cement columns. This 350 hp cementing unit (25 MPa working pressure) is designed for professional oilfield service companies who need reliable, field-proven cementing equipment that performs consistently under continuous well cementing duty.
SJ Petroleum Machinery manufactures this 25 MPa cementing unit to API 6A standards, with full factory pressure and flow testing before shipment. We provide on-site commissioning, operator training, and global spare parts support tailored to this model.
Key features
Power: 350 hp x 2
The 350 hp diesel engine and drivetrain are rated for continuous cementing pump duty. Critical components (Cummins engine, Siemens control system) are sourced from reputable manufacturers with global service support.
Working pressure: 25 MPa (3,600 psi)
Fluid end is designed for high-pressure service with modular valve seats and quick-change components. Field maintenance is straightforward; a trained crew can service the pump in hours, not days.
Operator cabin with data logging
Stand-alone air-conditioned operator cabin with pressure gauges, engine controls, and a data recorder for treating pressure, rate, and density. Operators work safely away from high-pressure lines.
Road-legal, single-unit transport
The entire unit is mounted on a standard truck or skid chassis. No disassembly needed for road transport. Drive or tow it to the well location, connect hoses, and start work.
Factory-tested before shipment
Every unit is API-certified (API 7K / API 6A as applicable) and manufactured under our ISO 9001 quality system. Full pressure testing, load testing, and function testing are conducted before leaving the factory. We provide test reports and certification documents with each shipment.
Global spare parts network
We supply spare parts kits, field service engineers, and operator training. Critical spare parts are stocked in our warehouse and shipped within 48 hours of order.
Where this unit fits
This 350 hp dual-pump cementing truck for sale is ideal for:
- Long cement column cementing: Twin-pump design provides redundancy for critical long-string cementing jobs
- Dual string casing cementing: Ability to cement multiple strings in sequence with high reliability
- Extended-reach wells: Combined pump output for horizontal and directional well cementing
- Backup and redundancy: Twin-pump configuration ensures job completion even if one pump requires maintenance
Is SGJ350-25 the right model for your well?
The SGJ350-25 is a 350 hp, 25 MPa twin-pump cementing truck. It is designed for medium-depth wells where twin-pump redundancy is required for critical cement jobs.
Choose this model when:
- Well depth: 1,500–2,500 m — 25 MPa working pressure covers intermediate casing cementing in medium-depth wells.
- Redundancy: required — Twin-pump design means if one pump fails, the other can still continue at reduced rate, avoiding lost cement jobs.
- Critical cement jobs: required — Suitable for production casing cementing where job failure is costly and non-negotiable.
- Mobility: required — Truck-mounted unit for moving between well locations.
SGJ350-25 vs SGJ400-15 — which to choose?
- SGJ350-25 (this model): 350 hp, 25 MPa, twin pump. Best for medium-depth wells 1,500–2,500 m where redundancy matters.
- SGJ400-15: 400 hp, 15 MPa, single pump. Choose for shallow wells < 1,500 m where high pressure and redundancy are not needed.
Operating sequence
The cementing operation follows these key steps:
- Site positioning: Truck or skid unit positioned at wellhead, suction and discharge lines connected
- Pre-job checks: Operator verifies fluid end condition, safety valves, and control system calibration
- Mix preparation: Mixing system prepares cement slurry to target density and specifications
- Pumping stage: Pump delivers slurry at controlled rate and pressure, operator monitors real-time data
- Displacement: After cement slurry, displacement fluid pushes cement to target depth
Common selections
- Intelligent control system: customized configuration tailored to your field conditions
- electric drive conversion.: customized configuration tailored to your field conditions
- Automated control system: PLC-based control with touchscreen HMI
- Data acquisition and recording: real-time monitoring and data logging
Buyer questions
Q: What is the lead time for a new unit?
A: 6–8 months for a new unit, depending on option list. Refurbished units available in 60–90 days.
Q: Do you supply the complete cementing spread for oil well cementing?
A: Yes. We can supply complete cementing spreads for oil well cementing operations: cementing trucks, batch mixers, cement tanks, and additive systems as a package, engineered to work together for onshore and offshore oilfield projects.
Q: Can you customize cementing units for deep well and high-pressure operations?
A: Yes. We customize cementing units for ambient temperature, terrain, power supply, and emission regulations. Whether you need desert, cold-weather, or offshore configurations, send your site conditions and we will return a tailored cementing truck configuration.
Q: What is the typical price range for this equipment?
A: Pricing depends on capacity, configuration, and option list. Contact our sales team with your requirements for a detailed quote. We offer factory-direct pricing with no middleman markup.
Q: Do you provide on-site commissioning and operator training?
A: Yes. We provide on-site installation supervision, commissioning, and operator training as part of every package. Our service engineers travel worldwide to support your team during startup and operation.
Manufacturing background
SJ Petroleum Machinery has been manufacturing cementing equipment since the 1980s, with over 500 cementing units delivered to oilfield operators in the Middle East, Central Asia, Africa, and Southeast Asia. Our cementing trucks and skids are API-certified and customized for well depths ranging from shallow to ultra-deep wells. We provide factory-direct pricing, global after-sales support, and on-site commissioning for your cementing operations.
Ready to discuss this model?
Send your well program, target pressure, flow rate requirement, and site conditions. We will return a tailored configuration and pricing within 48 hours.