Well Integrity
The primary function of wellhead equipment is well integrity. It suspends and seals the casing and tubing strings, containing well pressure and preventing uncontrolled flow to the surface.
Wellhead equipment is the permanent interface between the wellbore and surface operations. From casing heads and tubing heads to the Christmas tree and its valves, chokes and gauges —every component must reliably contain well pressure and provide safe access to the wellbore. We supply a complete range of API 6A compliant wellhead equipment.
The wellhead is the permanent assembly at the surface of an oil or gas well. It provides suspension and sealing for the casing and tubing strings, and a controlled interface for surface operations.
The primary function of wellhead equipment is well integrity. It suspends and seals the casing and tubing strings, containing well pressure and preventing uncontrolled flow to the surface.
The wellhead provides controlled access to the wellbore. Valves allow flow to be opened or closed. Chokes control flow rate and pressure. Testing ports allow pressure monitoring.
Unlike BOPs (which are temporary drilling equipment), the wellhead is a permanent (or long-term) installation on the well. It stays with the well through completion, production, and abandonment.
Wellhead equipment is designed and built to API 6A specification. This standard covers design, materials, testing, and manufacturing requirements for wellhead and Christmas tree equipment.
A complete wellhead system includes several key components, each with a specific function.
The base component of the wellhead. Hangs and seals the surface casing and intermediate casing strings. Provides outlets for casing annulus monitoring and access.
Installed above the casing head. Hangs and seals the production tubing string. Provides access to the tubing-casing annulus. The base for the Christmas tree.
The assembly of valves, chokes, and fittings installed on top of the tubing head. Controls production flow, provides well isolation, and allows access to the wellbore for operations.
Manual or hydraulic gate valves on the Christmas tree. Used to open or close flow. Master valves provide primary well isolation. Wing valves control flow through the production and annulus outlets.
Adjustable or positive choke on the Christmas tree. Controls flow rate and pressure. Critical for well production optimization and surface flow management.
Pressure gauges and transducers monitor tubing pressure and casing annulus pressure. Essential for well monitoring, production optimization, and well integrity verification.
Wellhead equipment is available in several standard pressure ratings. The rating you need depends on your well conditions.
| Pressure Rating | Equivalent | Typical Applications |
|---|---|---|
| 21 MPa (3,000 psi) | 3,000 psi class | Low pressure wells, shallow wells, water injection |
| 35 MPa (5,000 psi) | 5,000 psi class | Medium pressure wells, mature production wells |
| 70 MPa (10,000 psi) | 10,000 psi class | High pressure wells, most onshore production wells |
| 105 MPa (15,000 psi) | 15,000 psi class | Ultra-high pressure wells, deep wells, HP/HT |
Different well types and operations require different wellhead configurations.
Standard wellhead for production wells. Includes casing head, tubing head, and Christmas tree with production valves, choke, and gauges. Designed for long-term production service.
Wellhead for injection wells (water injection, gas injection, chemical injection). Similar configuration but may include additional injection valves and different trim selection for injection service.
Wellhead designed for well testing operations. Includes additional test connections, higher pressure rating, and features for well testing and production testing.
Wellhead for wells producing H2S (sour service). Special material selection per NACE MR0175 / ISO 15156 to prevent sulfide stress cracking. Essential for sour gas wells.
Explore our related product categories:
A wellhead is the permanent (or long-term) installation on the well —it stays with the well through completion, production, and abandonment. A BOP (blowout preventer) is temporary well control equipment installed during drilling and workover operations. BOPs are removed after the operation is complete. The wellhead is designed for long-term production service; BOPs are designed for emergency well sealing during operations.
The wellhead pressure rating must be at least equal to the maximum anticipated well pressure. For most onshore production wells, 70 MPa (10,000 psi) is standard. For deeper, higher-pressure wells, you may need 105 MPa (15,000 psi). Tell us your well depth, reservoir pressure, and expected flowing pressure, and we will recommend the right rating.
Yes. All our wellhead equipment is designed and manufactured to API 6A specifications. We provide complete documentation: material test reports, API monogram certification, and a complete factory test report. Third-party inspection (SGS, BV, etc.) can be arranged on request.
We supply both complete wellhead assemblies and individual components. A complete wellhead assembly includes: casing head, tubing head, Christmas tree, valves, choke, and gauges. We design the complete assembly as a single integrated system, so all components are matched to work together efficiently.
Sour service wellhead equipment is designed for wells that produce H2S (hydrogen sulfide), which is corrosive and can cause sulfide stress cracking in standard carbon steel. Sour service components use special materials per NACE MR0175 / ISO 15156 standards to resist H2S corrosion. If your well produces H2S, you must use sour service rated equipment. Tell us if your application involves H2S, and we will provide sour service compliant equipment.
Tell us your well type, pressure rating, and configuration requirements. Our engineers will help you choose the right wellhead assembly for your well.