Sizing a Coiled Tubing Unit

How to match the coiled tubing unit class to your well depth, string pull requirement and wellhead pressure.

Detail

The three numbers that size the CT unit

A coiled tubing unit is selected by three numbers: the maximum pull force needed to strip out the tubing, the tubing length required to reach the well objective, and the wellhead pressure the unit must control. Get those from the well program, and the CT unit class follows. Guessing at any one of them means either over-paying for capacity or under-building the spread.

Pull force is set by the weight of the tubing string in the hole plus the safety margin for a stuck string. Tubing length is set by the measured depth. Wellhead pressure is set by the pressure at surface during the intervention. These are physical requirements, not preferences.

Detail

Matching CT class to the well

Shallow wells and light intervention do not need a heavy CT spread. A light unit handles cleanout and logging on shallow wells, at lower capital and footprint cost. Mid-range units cover most onshore intervention across mixed well depths. Heavy CT units are for deep, high-pressure wells where the string weight and wellhead pressure push the mid-range unit to its limit.

The trap is defaulting to the largest CT unit in the range. A heavy unit on a shallow well wastes capital and takes more rig-up time than the job needs. The other trap is under-building: a mid-range unit on a deep well cannot pull the string when it sticks, and the intervention fails.

Detail

The intervention task matters

Different CT tasks demand different capability. Cleanout and logging are light duty. Milling, fishing and packer retrieval push pull and push harder. Underbalanced operations add pressure control demand. Tell us the measured depth, the wellhead pressure, the tubing size, and the intervention task planned, and we will position the right CT unit from the range, with engineering confirmation before mobilization.

Buyer Checklist

Key parameters to confirm before ordering

  • Pull force required: 180kN / 270kN / 360kN / 450kN
  • Tubing length needed: matches well measured depth
  • Wellhead pressure: standard / high pressure / HPHT
  • Intervention type: cleanout / milling / acidizing / completion
  • Mounting: truck / skid / offshore