Fracturing Diversion Manifold Skid
Fracturing diversion manifold skid, distributes flow from multiple pumps to multiple wellheads. Designed for professional oilfield service companies and operators who need reliable, field-proven equipment that performs consistently under continuous duty.
SJ Petroleum Machinery manufactures this unit to API standards, with full factory testing before shipment. We supply commissioning, operator training, and spare parts support on site.
Key features
Bore size: 3-4 inch
Engine and drivetrain are rated for continuous oilfield duty. All critical components are sourced from reputable manufacturers with global service support.
Working pressure: 105 MPa
Fluid end is designed for high-pressure service with modular components. Field maintenance is straightforward; a trained crew can service the unit in hours, not days.
Operator cabin with data logging
Stand-alone air-conditioned operator cabin with pressure gauges, engine controls, and a data recorder. Operators work safely away from high-pressure lines.
Road-legal, single-unit transport
The entire unit is mounted on a standard truck or skid chassis. No disassembly needed for road transport.
Factory-tested before shipment
Every unit undergoes full pressure testing, load testing, and function testing before leaving the factory. We provide test reports and certification documents with each shipment.
Global spare parts network
We supply spare parts kits, field service engineers, and operator training. Critical spare parts are stocked in our warehouse and shipped within 48 hours of order.
Where this unit fits
Cluster well pad fracturing, multi-well stimulation, large-scale frac operations.
Fracturing diversion manifold skid — the flow distributor for multi-well pads
The Fracturing Diversion Manifold Skid (bore 3–4 inch, 105 MPa) distributes flow from multiple frac pumps to multiple wellheads — the centerpiece of pad and zipper fracturing. On a multi-well pad, pumps do not each go to one well; the diversion manifold lets the fleet switch between wells and stages without rigging down and re-rigging.
Choose the diversion manifold when:
- You frac multiple wells from one pad (zipper frac). Alternating between wells per stage keeps pumps continuously loaded. The diversion manifold makes the switch instant and safe.
- You need to split pump capacity between wells. During simultaneous or partial operations, the manifold divides total pump flow between two wells at controlled rates.
- 105 MPa covers your treating pressure. The standard deep-frac envelope. For ultra-deep HPHT above 105 MPa, the 175 MPa class is required instead.
- Skid mounting fits your pad layout. The skid is crane-set at the pad center with flowlines to each wellhead — no truck chassis tied up during the campaign.
Diversion manifold vs standard fracturing manifold — the switching difference
- Standard fracturing manifold: Routes one pump fleet to one well with mainline valving. Simpler, lower cost.
- Diversion manifold (this unit): Multi-inlet, multi-outlet flow splitting for pad and zipper operations. The enabler of high-efficiency multi-well programs.
Operating sequence
On arrival at the well site, the unit is positioned and lines are connected. The engine or electric motor is started, warmed up, and ramped up to operating speed. The operator monitors pressure and rate from the control cabin.
Common selections
Remote control, actuator upgrade, custom flow paths.
Buyer questions
Q: What is the lead time for a new unit?
A: 6–8 months for a new unit, depending on option list. Refurbished units available in 60–90 days.
Q: Do you supply the complete system?
A: Yes. We can supply pumps, manifolds, controls, and auxiliary equipment as a complete package, engineered to work together.
Q: Can you customize for our site conditions?
A: Yes. We customize for ambient temperature, terrain, power supply, and emission regulations.
Manufacturing background
SJ Petroleum Machinery has manufactured oilfield equipment since the 1980s. Our equipment is API-certified and has shipped to operators in the Middle East, Central Asia, Africa, Southeast Asia, and South America.
Ready to discuss this model?
Send your project requirements, operating conditions, and site specifications. We will return a tailored configuration and pricing within 48 hours.