Fracturing Wellhead Quick Plug-In Device
Fracturing wellhead quick plug-in device, fast connection and disconnection for wellhead stimulation. Designed for professional oilfield service companies and operators who need reliable, field-proven equipment that performs consistently under continuous duty.
SJ Petroleum Machinery manufactures this unit to API standards, with full factory testing before shipment. We supply commissioning, operator training, and spare parts support on site.
Key features
Connection: Quick plug-in
Engine and drivetrain are rated for continuous oilfield duty. All critical components are sourced from reputable manufacturers with global service support.
Working pressure: 105 MPa
Fluid end is designed for high-pressure service with modular components. Field maintenance is straightforward; a trained crew can service the unit in hours, not days.
Operator cabin with data logging
Stand-alone air-conditioned operator cabin with pressure gauges, engine controls, and a data recorder. Operators work safely away from high-pressure lines.
Road-legal, single-unit transport
The entire unit is mounted on a standard truck or skid chassis. No disassembly needed for road transport.
Factory-tested before shipment
Every unit undergoes full pressure testing, load testing, and function testing before leaving the factory. We provide test reports and certification documents with each shipment.
Global spare parts network
We supply spare parts kits, field service engineers, and operator training. Critical spare parts are stocked in our warehouse and shipped within 48 hours of order.
Where this unit fits
Fast wellhead connection, multi-well operations, time-sensitive jobs.
Fracturing wellhead quick plug-in device — minutes instead of hours at the wellhead
The Fracturing Wellhead Quick Plug-In Device (105 MPa) replaces bolted flange connections with a fast connect/disconnect system at the wellhead. On multi-stage or zipper frac programs, the wellhead hookup is rigged up and torn down at every well — a quick plug-in connection turns that process from hours of bolting into minutes of locking.
Choose the quick plug-in device when:
- Your program moves between wells frequently. Pad, zipper, and multi-well campaigns re-hookup the wellhead constantly. Fast connection time directly extends pumping uptime.
- 105 MPa covers your treating pressure. The standard deep-frac class. For ultra-deep work, verify the rating against your pressure envelope.
- Crew efficiency matters on location. Bolting 105 MPa flanges is slow, heavy work. The plug-in mechanism reduces crew hours at the wellhead and the associated fatigue and exposure.
- You want consistent, repeatable wellhead seals. The plug-in device seals the same way every time — removing the variance of hand-torqued flange bolts between crews.
Quick plug-in vs bolted flange — speed versus familiarity
- Bolted flange: Proven everywhere, standard spares, any crew can rig it. But slow per connection.
- Quick plug-in (this device): Fast connect/disconnect at 105 MPa, repeatable sealing. Best for high-turnover multi-well programs where rig-up time is the constraint.
Operating sequence
On arrival at the well site, the unit is positioned and lines are connected. The engine or electric motor is started, warmed up, and ramped up to operating speed. The operator monitors pressure and rate from the control cabin.
Common selections
Custom wellhead compatibility, higher pressure rating.
Buyer questions
Q: What is the lead time for a new unit?
A: 6–8 months for a new unit, depending on option list. Refurbished units available in 60–90 days.
Q: Do you supply the complete system?
A: Yes. We can supply pumps, manifolds, controls, and auxiliary equipment as a complete package, engineered to work together.
Q: Can you customize for our site conditions?
A: Yes. We customize for ambient temperature, terrain, power supply, and emission regulations.
Manufacturing background
SJ Petroleum Machinery has manufactured oilfield equipment since the 1980s. Our equipment is API-certified and has shipped to operators in the Middle East, Central Asia, Africa, Southeast Asia, and South America.
Ready to discuss this model?
Send your project requirements, operating conditions, and site specifications. We will return a tailored configuration and pricing within 48 hours.