Workover-Rigs

Workover Rigs

Workover Rigs suits buyers who need well servicing and pulling in a field-deployable format. Its fit depends on working capacity and power arrangement and the project duty cycle.

Workover Rigs for oil and gas well servicing, truck and skid mounted
Product description

Workover Rigs & Well Servicing Units

SJ Petroleum Machinery manufactures a complete line of workover rigs and well servicing units for onshore oil and gas well intervention, completion, and workover operations. Our rigs range from 350 kN light-duty truck-mounted units for shallow well workover to 1500 kN ultra-deep units for 10,000 m wells.

Each rig is engineered as an integrated system —mast, drawworks, power unit, operator cabin, and auxiliary equipment —designed to work as a complete workover unit. All rigs are API 4F certified and factory-tested before shipment, with commissioning and training support on site.

Technical Highlights

Key features across the range

Power End

Well depth: 2000–6000 m

The diesel engine and drivetrain are rated for continuous workover rig duty. Critical components (Cummins engine, control system) are sourced from reputable manufacturers with global service support.

Main System

Pulling force: 350–500 kN

Main system is designed for heavy-duty oilfield service with modular components. Field maintenance is straightforward; a trained crew can service the unit in hours, not days.

Control

Operator cabin with data logging

Stand-alone air-conditioned operator cabin with gauges, controls, and a data recorder. Operators work safely away from high-pressure lines.

Mobility

Road-legal, single-unit transport

The entire unit is mounted on a standard truck or skid chassis. No disassembly needed for road transport.

Build Quality

Factory-tested before shipment

Every unit is API-certified (API 7K / API 6A as applicable) and manufactured under our ISO 9001 quality system. Full function testing, pressure testing, and load testing are conducted before leaving the factory. We provide test reports and certification documents with each shipment.

Service Support

Global spare parts network

We supply spare parts kits, field service engineers, and operator training. Critical spare parts are stocked in our warehouse and shipped within 48 hours of order.

Applications

Where this equipment fits

Well workover, completion, well intervention, pipe running, casing handling.

Selection Guide

Choosing a workover rig — hook load class, environment, and automation level

The SJ workover line spans 350 kN light-duty truck units to 1,500 kN ultra-deep units for 10,000 m wells, plus environment-specialized rigs (cold, desert, mountain) and power variants (LNG, electric, hybrid). The first decision is hook load class — determined by your deepest string and heaviest pull. The second is environment fit. The third is power and automation level.

Choose your rig class when:

  • 350–450 kN: Light workover, cleaning, shallow wells — the flushing/XJ350 class. Lowest cost, fastest moves.
  • 450–750 kN: Standard workover and completion — the SXJ750 class. The most common onshore choice.
  • 750–900 kN: Deep well workover and completion — the XJ900 class. For heavy strings and 5,000–7,000 m wells.
  • 1,500 kN+: Ultra-deep 8,000–10,000 m HPHT wells — the specialist class at the top of the range.

Environment and power variants — match the rig to the field, not just the well

  • Environment: Cold weather (-45°C), desert (55°C), and mountain multi-stage mast rigs are built for specific fields. Choose the variant that matches your operating climate.
  • Power: Diesel mechanical (standard), LNG (gas-adjacent sites), electric/hybrid (emissions rules or fleet electrification). The power choice follows your fuel and emissions strategy.
  • Automation: Standard, automated package (roughneck + catwalk), and full-automatic — automation level follows crew availability and program frequency.
How It Works

Operating sequence

On arrival at the well site, the unit is positioned and lines are connected. The engine or electric motor is started, warmed up, and ramped up to operating speed. The operator monitors pressure and rate from the control cabin.

Configuration Options

Common selections

  • Cold weather package: customized configuration tailored to your field conditions
  • desert package: customized configuration tailored to your field conditions
  • automated iron roughneck: customized configuration tailored to your field conditions
  • battery hybrid electric drive.: customized configuration tailored to your field conditions
  • Automated control system: PLC-based control with touchscreen HMI
  • Data acquisition and recording: real-time monitoring and data logging
FAQ

Buyer questions

Q: What is the lead time for a new unit?
A: 8–10 months for a new unit, depending on option list. Refurbished units available in 90–120 days.

Q: Do you supply the complete system?
A: Yes. We can supply the main unit plus auxiliary equipment as a complete package, engineered to work together.

Q: Can you customize for our site conditions?
A: Yes. We customize for ambient temperature, terrain, power supply, and emission regulations.

Q: What is the typical price range for this equipment?
A: Pricing depends on capacity, configuration, and option list. Contact our sales team with your requirements for a detailed quote. We offer factory-direct pricing with no middleman markup.

Q: Do you provide on-site commissioning and operator training?
A: Yes. We provide on-site installation supervision, commissioning, and operator training as part of every package. Our service engineers travel worldwide to support your team during startup and operation.

Why SJ Petro

Manufacturing background

SJ Petroleum Machinery has been building workover rigs since the 1980s, with hook loads from 350 kN to 1500 kN for well servicing and completion operations. Our workover rigs are available in mechanical, hydraulic, and fully electric configurations, customized for desert, arctic, offshore, and urban-fringe environments. We deliver factory-direct equipment to operators in over 30 countries.

Get a Quote

Ready to discuss your requirements?

Send your project requirements, operating conditions, and site specifications. We will return a tailored configuration and pricing within 48 hours.

Product Parameters

Parameter table

ModelNominal hook load kN(lb)Max. Load kN(lb)EnginePowerkW(hp)
600(131508)
700(151740)242(325)
SXJ350(XJ900)600(134880)900(1202320)287(385)
SXJ400(XJ1020)800(220304)1020(229296)335(450)
SXJ450(XJ1100)800(220304)1100(252900)354(475)
SXJ550(XJ1350)1000(264365)1350(303480)403(540)
SXJ650(XJ1600)1200(303480)1600(330456)522(700)
SXJ750(XJ1800)1500(337200)1800(382160)403×2(540×2)
SXJ1000(XJ2250)1800(404640)2250(505800)470×2(630×2)
SXJ27502250(505800)2750(618200)485×2(650x2)
Related products

More from Workover-Rigs

Automated Workover Rig Package
Automated-Workover-Rig-Package

Automated-Workover-Rig-Package

Automated Workover Rig Package combines workover rig package duties with a packaged layout. Buyers usually check hook load and mast handling, automatic sequence control, and field operation.

View details
Cold Weather Workover Rig
Cold-weather-Workover-Rig

Cold-weather-Workover-Rig

Cold Weather Workover Rig is a field-deployable workover rig package for well servicing and pulling. The shortlist starts with hook load and mast handling and the control package.

View details
Desert Workover Rig
Desert-Workover-Rig

Desert-Workover-Rig

Desert Workover Rig suits buyers who need well servicing and pulling in a field-deployable format. Its fit depends on hook load and mast handling and the project duty cycle.

View details
Dual Fastline Workover Rig
Dual-Fastline-Workover-Rig

Dual-Fastline-Workover-Rig

Dual Fastline Workover Rig is a field-deployable workover rig package for well servicing and pulling. The shortlist starts with hook load and mast handling and the control package.

View details
Flushing Workover Rig
Flushing-Workover-Rig

Flushing-Workover-Rig

Flushing Workover Rig suits buyers who need well servicing and pulling in a field-deployable format. Its fit depends on hook load and mast handling and the project duty cycle.

View details
Free Standing Workover Rig
Free-standing-Workover-Rig

Free-standing-Workover-Rig

Free Standing Workover Rig combines workover rig package duties with a field-deployable layout. Buyers usually check hook load and mast handling, field-side control, and field operation.

View details