LNG Workover Rig
LNG-fueled workover rig, reduced emissions, for LNG plant adjacent well sites. Designed for professional oilfield service companies and operators who need reliable, field-proven workover equipment that performs consistently under continuous duty.
SJ Petroleum Machinery manufactures this high-pressure workover rig to API standards, with full factory testing before shipment. We provide on-site commissioning, operator training, and global spare parts support tailored to this model.
Key features
Power: LNG-fueled diesel
The diesel engine and drivetrain are rated for continuous workover rig duty. Critical components (Cummins engine, control system) are sourced from reputable manufacturers with global service support.
Hook load: 450-750 kN
Hoisting system is designed for heavy-duty workover service with modular components. Field maintenance is straightforward; a trained crew can service the unit in hours, not days.
Operator cabin with data logging
Stand-alone air-conditioned operator cabin with pressure gauges, engine controls, and a data recorder for hook load, block position, and operational parameters. Operators work safely away from high-pressure lines.
Road-legal, single-unit transport
The entire unit is mounted on a standard truck or skid chassis. No disassembly needed for road transport. Drive or tow it to the well location, set up the mast, and start work.
Factory-tested before shipment
Every unit is API-certified (API 7K / API 6A as applicable) and manufactured under our ISO 9001 quality system. Full load testing, function testing, and pressure testing are conducted before leaving the factory. We provide test reports and certification documents with each shipment.
Global spare parts network
We supply spare parts kits, field service engineers, and operator training. Critical spare parts are stocked in our warehouse and shipped within 48 hours of order.
Where this unit fits
This LNG-rated workover rig is specifically designed for:
- LNG plant adjacent locations: Explosion-proof and spark-resistant design for LNG facility proximity
- Environmentally sensitive areas: Low-emission operation for protected industrial environments
- Low-emission requirements: Specialized emissions control for strict environmental compliance
- Petrochemical facility operations: Safe operation near refineries and petrochemical plants
LNG-fueled workover rig — when gas fueling is not a gimmick
The LNG Workover Rig (450–750 kN hook load) burns LNG instead of diesel. For most fields, diesel is simpler and more available — LNG fueling only makes sense in specific situations: LNG plant-adjacent well sites where gas is available on-site, sour gas fields, and emissions-restricted areas where LNG's cleaner burn matters.
Choose the LNG rig when:
- Your well site is near an LNG plant or gas supply. If gas is available on location (LNG terminal, plant, or pipeline), fueling from it avoids diesel truck logistics entirely — no fuel convoys, no diesel storage tanks on site.
- Emissions and noise restrictions are strict. LNG burns cleaner than diesel: lower particulates, lower NOx, less noise. In urban-fringe or environmentally sensitive operations, this can be the compliance difference.
- You operate in sour gas fields. The rig is LNG-rated for sour service. If your field produces H2S, equipment rated for sour environments is required regardless of fuel; pairing it with LNG keeps the fuel side consistent with the field's gas.
- Your fleet is standardizing on gas. Some operators are moving service fleets to gas for ESG reporting and fuel-cost reasons. If your strategy is gas-based, the LNG rig fits rather than fighting it with a diesel outlier.
LNG vs diesel workover rig — the honest comparison
- Diesel: Universal fuel availability, proven refueling network, simpler tanks. Right for most fields — LNG is only better where gas is on-site or emissions rules force it.
- LNG (this rig): Cleaner burn, on-site gas fueling near LNG sources, sour-service rating. Choose for LNG-adjacent sites, sour fields, or strict emissions zones.
Operating sequence
The workover operation follows these key steps:
- Rig positioning and rig-up: Workover rig positioned at wellhead, mast raised and secured, BOP stack connected
- Pre-job checks: Operator verifies drawworks, brakes, mast structure, and control system calibration
- Tubing tripping: Drawworks runs in and pulls out tubing or rod string from the wellbore
- Well intervention: Perform well servicing operations such as pump changes, plug setting, or well cleanup
- Rig down and move: After job completion, rig is rigged down and moved to next location
Common selections
- LNG storage tank: customized configuration tailored to your field conditions
- dual-fuel capability.: customized configuration tailored to your field conditions
- Automated control system: PLC-based control with touchscreen HMI
- Data acquisition and recording: real-time monitoring and data logging
Buyer questions
Q: What is the lead time for a new unit?
A: 6–8 months for a new unit, depending on option list. Refurbished units available in 60–90 days.
Q: Do you supply the complete workover spread?
A: Yes. We can supply workover rigs, flushing units, snubbing units, and auxiliary equipment as a complete package.
Q: Can you customize workover rigs for your site conditions?
A: Yes. We customize workover rigs for ambient temperature, terrain, power supply, and emission regulations. Whether you need desert, cold-weather, or offshore configurations, send your site conditions and we will return a tailored unit configuration.
Q: What is the typical price range for this equipment?
A: Pricing depends on capacity, configuration, and option list. Contact our sales team with your requirements for a detailed quote. We offer factory-direct pricing with no middleman markup.
Q: Do you provide on-site commissioning and operator training?
A: Yes. We provide on-site installation supervision, commissioning, and operator training as part of every package. Our service engineers travel worldwide to support your team during startup and operation.
Manufacturing background
SJ Petroleum Machinery has been building workover rigs since the 1980s, with hook loads from 350 kN to 1500 kN for well servicing and completion operations. Our workover rigs are available in mechanical, hydraulic, and fully electric configurations, customized for desert, arctic, offshore, and urban-fringe environments. We deliver factory-direct equipment to operators in over 30 countries.
Ready to discuss this model?
Send your well program, target depth, hook load requirement, and site conditions. We will return a tailored configuration and pricing within 48 hours.