Fracturing-Equipment

SHS20 Pulse Sand Blending Truck

Shs20 Pulse Sand Blending Truck is a truck-mounted sand blending package for high-horsepower stimulation. The shortlist starts with pumping duty and sand handling and the control package.

SHS20 Pulse Sand Blending Truck, pulse sand conveying for frac
Product description

SHS20 Pulse Sand Blending Truck

Pulse sand blending truck, pulse sand delivery technology, reduces sand plugging risk for plugging-prone formations. This heavy-duty fracturing unit (high-pressure working capacity) is designed for professional oilfield service companies who need reliable, field-proven fracturing equipment that performs consistently under continuous hydraulic fracturing duty.

SJ Petroleum Machinery manufactures this high-pressure fracturing unit to API 6A standards, with full factory pressure and flow testing before shipment. We provide on-site commissioning, operator training, and global spare parts support tailored to this model.

Technical Highlights

Key features

Power End

Drive: Diesel mechanical

The diesel engine and drivetrain are rated for continuous fracturing pump duty. Critical components (Cummins engine, control system) are sourced from reputable manufacturers with global service support.

Fluid End

Capacity: 20 bbl/blend, pulse

Fluid end is designed for high-pressure service with modular valve seats and quick-change components. Field maintenance is straightforward; a trained crew can service the pump in hours, not days.

Control

Operator cabin with data logging

Stand-alone air-conditioned operator cabin with pressure gauges, engine controls, and a data recorder for treating pressure, rate, and density. Operators work safely away from high-pressure lines.

Mobility

Road-legal, single-unit transport

The entire unit is mounted on a standard truck or skid chassis. No disassembly needed for road transport. Drive or tow it to the well location, connect hoses, and start work.

Build Quality

Factory-tested before shipment

Every unit is API-certified (API 7K / API 6A as applicable) and manufactured under our ISO 9001 quality system. Full pressure testing, load testing, and function testing are conducted before leaving the factory. We provide test reports and certification documents with each shipment.

Service Support

Global spare parts network

We supply spare parts kits, field service engineers, and operator training. Critical spare parts are stocked in our warehouse and shipped within 48 hours of order.

Applications

Where this unit fits

This pulse sand blending truck is specifically designed for:

  • Plugging-prone formations: Pulse technology prevents screen-out and proppant bridging in challenging formations
  • Low-permeability tight sandstone: Optimized proppant delivery for tight sandstone reservoir stimulation
  • Shale gas fracturing operations: Reliable sand blending for multi-stage horizontal shale gas wells
  • Complex hydraulic fracturing designs: Precision proppant concentration control for customized fracturing treatments
Selection Guide

SHS20 Pulse or standard SHS20 — when does pulse sand delivery matter?

The SHS20 Pulse is a truck-mounted sand blending unit (20 bbl blend capacity) with pulse sand delivery technology. The pulse system feeds proppant in controlled pulses instead of a continuous stream, which dramatically reduces the risk of sand plugging in plugging-prone formations. This is the deciding factor between this unit and the standard SHS20.

Choose the pulse version when:

  • Your formations are known for screen-outs or sand bridging. Some reservoirs (low-permeability carbonates, naturally fractured zones, high-stress tight formations) bridge easily — sand piles up at the perforations and the job screens out. Pulse delivery breaks the proppant into slugs that stay mobile through the near-wellbore, reducing bridging risk.
  • You are placing high proppant concentrations (6+ PPA). At high concentrations, continuous sand feed becomes prone to plugging in the blender discharge and surface lines. Pulse delivery keeps slurry flowing at high concentration without packing off.
  • You run long proppant stages with limited flush time. If your stage design leaves little margin for flushing after the last sand, a screen-out risk is costly — you may leave proppant in the wellbore. The pulse system lowers that risk on every stage.
  • You need the same 20 bbl blend capacity on a road-legal truck. The pulse feature is an upgrade on the standard SHS20 platform, not a different capacity class. If you need pulse capability and truck mobility together, this is the model.

SHS20 Pulse vs standard SHS20 vs SHS20T trailer — which blender fits your program?

  • Standard SHS20: Continuous feed, lower cost. Right for conventional reservoirs with low screen-out risk.
  • SHS20 Pulse (this unit): Pulse feed for plugging-prone formations and high proppant concentrations. Costs more but reduces screen-out risk on difficult stages.
  • SHS20T trailer: Same blending duty on a trailer for fleet-tractor transport. Choose for mobility style, not blending capability.
How It Works

Operating sequence

The hydraulic fracturing operation follows these key steps:

  1. Site setup: Frac unit positioned at wellhead, high-pressure iron connected to manifold and wellhead
  2. Pre-job checks: Operator verifies pump condition, pressure safety valves, and data acquisition system calibration
  3. Slurry preparation: Sand blender mixes proppant with fracturing fluid at controlled concentration
  4. Pumping stage: Frac pump delivers high-pressure slurry at controlled rate, operator monitors pressure and proppant concentration
  5. Stage completion: After each stage, well is flushed and pressure is monitored before next stage
Configuration Options

Common selections

  • Electric drive conversion: customized configuration tailored to your field conditions
  • cold weather package: customized configuration tailored to your field conditions
  • automatic sand delivery control.: customized configuration tailored to your field conditions
  • Automated control system: PLC-based control with touchscreen HMI
  • Data acquisition and recording: real-time monitoring and data logging
FAQ

Buyer questions

Q: What is the lead time for a new unit?
A: 6–8 months for a new unit, depending on option list. Refurbished units available in 60–90 days.

Q: Do you supply the complete fracturing spread for shale gas stimulation?
A: Yes. We can supply complete fracturing spreads for shale gas and tight oil stimulation: frac pumps, sand blenders, manifolds, and data vans as a package, engineered to work together for onshore oilfield hydraulic fracturing projects.

Q: Can you customize fracturing units for high-pressure and high-volume operations?
A: Yes. We customize fracturing units for ambient temperature, terrain, power supply, and emission regulations. Whether you need diesel, electric, or hybrid configurations, send your site conditions and we will return a tailored frac unit configuration.

Q: What is the typical price range for this equipment?
A: Pricing depends on capacity, configuration, and option list. Contact our sales team with your requirements for a detailed quote. We offer factory-direct pricing with no middleman markup.

Q: Do you provide on-site commissioning and operator training?
A: Yes. We provide on-site installation supervision, commissioning, and operator training as part of every package. Our service engineers travel worldwide to support your team during startup and operation.

Why SJ Petro

Manufacturing background

SJ Petroleum Machinery has over 30 years of experience manufacturing fracturing equipment for oilfield stimulation. Our fracturing trucks, blenders, and sand handling units have been deployed in shale gas and tight oil operations across North America, the Middle East, and Central Asia. All units are API-certified and available with diesel, electric, or hybrid drive options to match your field conditions and emission requirements.

Get a Quote

Ready to discuss this model?

Send your well program, target pressure, flow rate requirement, and site conditions. We will return a tailored configuration and pricing within 48 hours.

Product Parameters

Parameter table

ModelSand capacity bbl(m³)Mixing density g/cm³Blending rate m³/minWater tank LDrive / mounting
SHS20 Pulse20(3.2)1.0–1.412 (pulse mode)8000Diesel, 8×6 truck, pulse sand-conveying
Related products

More from Fracturing-Equipment

Automated Continuous Sand Conveying Units
Automated-continuous-sand-conveying-units

Automated-continuous-sand-conveying-units

Automated Continuous Sand Conveying Units combines sand blending package duties with a field-deployable layout. Buyers usually check pumping duty and sand handling, automatic sequence control, and field operation.

View details
Dry Fracturing Equipment
Dry-Fracturing-Equipment

Dry-Fracturing-Equipment

Dry Fracturing Equipment is a field-deployable fracturing spread package for high-horsepower stimulation. The shortlist starts with pumping duty and sand handling and the control package.

View details
Fracturing Fluid Continuous Mixing Truck
Fracturing-fluid-continuous-mixing-truck

Fracturing-fluid-continuous-mixing-truck

Fracturing Fluid Continuous Mixing Truck suits buyers who need high-horsepower stimulation in a truck-mounted format. Its fit depends on pumping duty and sand handling and the project duty cycle.

View details
Fracturing Manifolds Truck
Fracturing-Manifolds-Truck

Fracturing-Manifolds-Truck

Fracturing Manifolds Truck is a truck-mounted fracturing spread package for high-horsepower stimulation. The shortlist starts with pumping duty and sand handling and the control package.

View details
Full Electric Drive Fracturing Continuous Mixing Skid
Full-electric-drive-fracturing-continuous-mixing-skid

Full-electric-drive-fracturing-continuous-mixing-skid

Full Electric Drive Fracturing Continuous Mixing Skid suits buyers who need high-horsepower stimulation in a skid-mounted format. Its fit depends on pumping duty and sand handling and the project duty cycle.

View details
Instrument Vans
Instrument-Vans

Instrument-Vans

Instrument Vans suits buyers who need high-horsepower stimulation in a field-deployable format. Its fit depends on pumping duty and sand handling and the project duty cycle.

View details